Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,182 decisions within 5 km, 6 exact-site or onsite candidate records, and 124 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
124 structured nearby appeal records.
124 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCT A 3 STORY OFFICE BUILDING, ALTER THE ROAD LAYOUT AND INCORPORATE ADDITIONAL CAR PARK WITH ALL ASSOCIATED SITE WORKS
TO RETAIN AN EXISTING PORTAL FRAME STORAGE SHED AND PLANNING PERMISSION TO; (A) CONSTRUCT AN EXTENSION TO THE ABOVE EXISTING STORAGE SHED, (B) CONSTRUCT A NEW PORTAL FRAME MEATERIALS STORAGE SHED, (C) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (D) ERECT A NEW BOUNDARY FENCE, (E) EXTEND AN EXISTING CONCRETE YARD AND ALL ANCILLARY SITE WORKS
CONSTRUCT A SINGLE STOREY, ESB MV SUBSTATION AND CUSTOMER SWITCH ROOM, PER ESB SPECIFICATIONS, WITHIN ITS EXISTING SITE COMPLEX
(A) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (B) EXTEND AN EXISTING CONCRETE YARD, (C) ERECT A NEW BOUNDARY FENCE AND ALL ANCILLARY SITE WORKS
ERECT 3,791.00 M2 OF PHOTOVOLTAIC PANELS ON THE ROOF OF TWO BUILDINGS OF OUR FACTORY, WITH ALL ASSOCIATED SITE WORKS
Planning permission to construct a new employee car park with combined vehicular and pedestrian entrance, inclusive of all associated drainage, ancillary site works and landscaping all at the Ballyspillane Industrial Estate, Ballyspillane, Killarney, County Kerry.
The brief summarizes the pattern across all 1,182 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211426The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief