Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,184 decisions within 5 km, 6 exact-site or onsite candidate records, and 124 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
124 structured nearby appeal records.
124 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A 3 STORY OFFICE BUILDING, ALTER THE ROAD LAYOUT AND INCORPORATE ADDITIONAL CAR PARK WITH ALL ASSOCIATED SITE WORKS
TO RETAIN AN EXISTING PORTAL FRAME STORAGE SHED AND PLANNING PERMISSION TO; (A) CONSTRUCT AN EXTENSION TO THE ABOVE EXISTING STORAGE SHED, (B) CONSTRUCT A NEW PORTAL FRAME MEATERIALS STORAGE SHED, (C) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (D) ERECT A NEW BOUNDARY FENCE, (E) EXTEND AN EXISTING CONCRETE YARD AND ALL ANCILLARY SITE WORKS
CONSTRUCT A SINGLE STOREY, ESB MV SUBSTATION AND CUSTOMER SWITCH ROOM, PER ESB SPECIFICATIONS, WITHIN ITS EXISTING SITE COMPLEX
(A) CONSTRUCT A NEW PORTAL FRAME SHED FOR THE STORAGE AND CHARGING OF FORKLIFTS, (B) EXTEND AN EXISTING CONCRETE YARD, (C) ERECT A NEW BOUNDARY FENCE AND ALL ANCILLARY SITE WORKS
ERECT 3,791.00 M2 OF PHOTOVOLTAIC PANELS ON THE ROOF OF TWO BUILDINGS OF OUR FACTORY, WITH ALL ASSOCIATED SITE WORKS
Planning permission to construct a new employee car park with combined vehicular and pedestrian entrance, inclusive of all associated drainage, ancillary site works and landscaping all at the Ballyspillane Industrial Estate, Ballyspillane, Killarney, County Kerry.
The brief summarizes the pattern across all 1,184 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211426The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief