Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 1,024 decisions within 5 km, 4 exact-site or onsite candidate records, and 77 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
77 structured nearby appeal records.
77 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
DEMOLISH EXISTING SIDE EXTENSION AND PERMISSION TO CONSTRUCT A NEW EXTENSION AND ALTERATIONS TO EXISTING DWELLING, THE CONSTRUCTION OF A NEW GARDEN/STORAGE SHED INCLUDING ALL ASSOCIATED SITE DEVELOPMENT WORKS
(1) REMOVE EXISTING REAR PORCH/WC, (2) ERECT NEW SINGLE STOREY GRANNY FLAT EXTENSION TO THE REAR/EAST SIDE OF EXISTING DWELLING AND (3) FIT NEW VELUX TO SOUTH SIDE OF ROOF TO NEW EXTENSION AND FOR ALL ANCILLARY SITE WORKS ASSOCIATED WITH THE DEVELOPMENT
Planning Permission to remove existing glazed porch and construct in-lieu of same a new hipped roof porch to the front our existing dwelling complete with all ancillary site works associated with the development
(1) DEMOLISH EXISTING GARAGE AND BOILER HOUSE (2) CONSTRUCT TWO STOREY AND SINGLE STOREY EXTENSION TO THE REAR OF EXISTING DWELLING (NORTH SIDE) AND INCORPORATE SOLAR PANELS ON TWO STOREY EXTENSION. (3) CONSTRUCT TWO STOREY EXTENSION TO THE SIDE OF EXISTING DWELLING (WEST SIDE). (4) INCORPORATE SOLAR PANELS TO SOUTHERN FACING ROOF (5) CONSTRUCT FRONT PORCH (6) REPLACE EXISTING FRONT WINDOWS WITH CHANGE IN DESIGN (7) CLAD EXISTING AND PROPOSED FRONT ELEVATION WITH INSULATION PANELS (8) CARRY OUT INTERNAL MODIFICATIONS TO EXISTING DWELLING (9) ANCILLARY SITE WORKS ASSOCIATED WITH THE ABOVE
CONSTRUCTION OF A SINGLE STOREY EXTENTION TO REAR OF EXISTING DWELLING HOUSE AND ALL ANCILLARY WORKS
THE DEMOLITION OF THE EXISTING TWO STOREY CBS MONASTERY BUILDING AND THE CONSTRUCTION OF A RESIDENTIAL DEVELOPMENT COMPRISING OF 14 NO. 2 STOREY DETACHED, SEMI-DETACHED AND TERRACED DWELLINGS (4 NO. 2-BD AND 10 NO. 3-BED). THE PROPOSED DEVELOPMENT ALSO PROVIDES FOR 28 NO. CAR PARKING SPACES, UTILISATION OF EXISTING VEHICULAR ENTRANCE FROM CASTLECOUNTESS WITH NEW GATES PROPOSED, ESB SUBSTATION, LANDSCAPING INCLUDING PLAY AREA, BOUNDARY TREATMENTS AND ALL ASSOCIATED AND ANCILLARY SITE WORKS NECESSARY TO FACILITATE THE DEVELOPMENT
The brief summarizes the pattern across all 1,024 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211528The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief