Applications tied to the site
Partial coverage10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 112 decisions within 5 km, 10 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
10 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
10 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(1) an outside bar area, (2) an external decking area, (3) external seating and (4) demountable canopy gazebo's or pop up tents, with external lighting to the rear garden area for use ancillary to the existing main Public Bar, Retention Permission also for 3 no. garden sheds for use ancillary to the existing combined bar business and residential premises
The as constructed single storey extension to the rear of dwelling and associated site works
(1) an existing vehicular access and (2) an existing pedestrian access, with associated stone walls and piers and with access via Cois na hAbhainn housing estate. All of the above being located within the overall land ownership area of the applicant and ancillary to the enjoyment of the residential part of the premises
Construction of two dwellings consisting of one semi-detached unit with all associated site works
Changes to planning permission ref 18/601008 to remove an existing single storey extension, a shed and out buildings to the rear of the dwelling and to construct a single storey extension to the rear with refurbishments to the existing dwelling. Retentions are 1 to retain windows, doors and roof lights on the rear extension which differs from the fenestration on the original planning application. 2 to retain solar PVs mounted on the rear extension roof. 3 to retain a stone finish to the front elevation and traditional plaster finish to the side and rear elevations of the original structure and the rear extensions elevations and 4 to retain velux roof lights to the rear roof of the original structure on our lands
To remove an existing single storey extension, a shed and out buildings to the rear of the dwelling and to construct a single storey extension to the rear with refurbishments to the existing dwelling and all associated site works
The brief summarizes the pattern across all 112 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211664The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief