Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 632 decisions within 5 km, 1 exact-site or onsite candidate record, and 53 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
53 structured nearby appeal records.
53 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
For a front & rear dormer extension, single storey side extension all to an existing detached bungalow, ancillary alterations to all elevations, detached garage, foul water to on site effluent treatment system & percolation area (to replace existing septic tank), surface water to soakaways and all associated site works
To renovate and extend existing dwelling house, converting the bungalow to dormer, a new domestic garage, also decommission existing septic tank and install a new onsite treatment system and soil polishing filter, upgrade existing entrance and all associated and necessary site works
(a) construction of a milking parlour, drafting and handling facilities, waiting yard with underground slatted slurry storage tank, and ancillary dairy rooms. (b) construction of an agricultural cubicle shed to include underground slatted tanks. (c) relocation of a farm-yard entrance and access roadway. (d) erection of an external meal bin, water tank and all associated siteworks
Construction of a 2 storey 4 bedroom dwelling house with single story living space attached, septic tank, percolation area and associated site works
The construction of a 2 storey 4 bedroom dwelling house with single storey living space attached, detached garage, septic tank, percolation area and associated site works
(1) Retention of development as constructed including amended red line site boundary to that permitted under Planning Reference 06/11. (2) Modifications to dwelling size and location to that permitted under Planning Reference 06/11. (3) Retention for detached domestic garage of c. 36m² as constructed on site. (4) Modifications to entrance as granted under Planning Reference 06/11. (5) Retention for effluent treatment system in lieu of septic tank as granted under Planning Reference 06/11
The brief summarizes the pattern across all 632 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 211759The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief