11% of nearby decided applications were refused. The site check found 1,177 decisions within 5 km, 2 exact-site or onsite candidate records, and 99 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
99 structured nearby appeal records.
99 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A water recycling plant, comprising single/part two storey enclosures for mechanical and electrical equipment, storage tanks approx. 15m high and evaporating equipment approx. 20m high, access road, perimeter fence and ancillary site works
The development that will consist of permission for: (1) The construction of building extensions to the rear(north-east) of the existing facility including roof plant & equipment. (2) The construction/installation of tanks, plant & equipment, equipment enclosures and associated bunds to the existing tank farm & nitrogen compound, to the rear of the main facility. (3) The installation of an access panel in the front(south-west) facade. (4) Modifications/Retention permission to previously as granted scheme under planning ref. no. 18/884, including facade changes, modifications to roof plant and roof access stairs. (5) All associated ancillary site works
1. the construction of additional first floor area within the footprint of the existing utility building providing additional office and plant room space & 2. minor alterations to the external façade at the rear of the facility consisting of the replacement of 2 no. existing louvers with new windows & the reduction in height of an existing roller shutter door
The erection of a fence & gate to the boundary with UL Bohemian RFC, installation of a gate in the existing fence, and all ancillary site works
First floor office area (127sq.m). Planning Permission is also sought for additional first floor office area (172sq.m), both constructed internally over existing production support space
The development that comprises: (a) the retention of modifications to previously approved permission Planning Ref. No. 15/180 to omit the 3-storey office building and canteen to the front (south-west) of the main facility; and (b) the retention of 2 no. groups of temporary cabin structures to the front (south-west) of the main facility, and associated site works
The brief summarizes the pattern across all 1,177 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 211793The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.