Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 744 decisions within 5 km, 1 exact-site or onsite candidate record, and 43 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
43 structured nearby appeal records.
43 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development consisting of carrying out the reinstatement of a stone breakwater and the removal of silt build up from a boat slipway. A Natura Impact Statement will accompany this application.
A one and a half storey dwelling, domestic garage, proprietary waste water treatment unit and percolation area and associated site works
Construct new detached dwelling house with onsite wastewater treatment system, connection to public services and all associated site works
A 10 YEAR PLANNING PERMISSION TO BE DEVELOPED ON A PHASED BASIS, COMPRISING 1) CONSERVATION AND DEVELOPMENT OF HAZELWOOD HOUSE, A PROTECTED STRUCTURE (RPS NO. 293SE), INCLUDING ITS ADJOINING WINGS AND EXTENSIONS FOR PUBLIC ASSEMBLY, AND OFFICE USE, WITH RETAIL IN THE GROUND FLOOR OF THE EAST WING ACCESSED FROM THE STABLEYARD AND STAFF FACILITIES IN THE WEST WING COMPRISING: I) DEMOLITION OF THREE STOREY CONCRETE ESCAPE STAIR EXTENSION (18.75 SQ. M.) AND ADJOINING THREE STOREY TOILET BLOCK EXTENSION (4 SQ. M) AND INSERTION OF NEW PLATFORM LIFT WITHIN THE HOUSE TO PROVIDE UNIVERSAL ACCESS TO THE LOWER GROUND FLOOR (BASEMENT), GROUND FLOOR AND FIRST FLOOR; II) REALIGNMENT OF THE TERRACES TO THE SOUTH OF HAZELWOOD HOUSE AND EXTENSION TOWARDS THE DISTILLERY BUILDING; III) INSTALLATION OF AN ‘EYE-CATCHER’ (FOCAL POINT) WITHIN THE GARDEN; IV) PROVISION OF SCREENING OF THE FACADE OF THE DISTILLERY BUILDING ALONG WITH EXTERNAL PLANTING TO THE FOREGROUND; 2) CONSERVATION AND DEVELOPMENT OF THE STABLE BUILDINGS TO THE EAST OF HAZELWOOD HOUSE TO PROVIDE A NEW CAFÉ AND RECEPTION IN THE SOUTH RANGE WITH A NEW SINGLE STOREY EXTENSION ON THE SOUTHERN ELEVATION OF THE BUILDING (97 SQ. M.) AND VISITOR WC’S, STORAGE, TASTING ROOMS AND A MICRO-DISTILLERY IN THE NORTH RANGE; 3) WORKS WITHIN THE WALLED GARDEN TO THE WEST OF HAZELWOOD HOUSE COMPRISING: I) CONSERVATION AND REPAIR WORKS TO THE MASONRY WALLS AND CIRCULAR STRUCTURE, II) THE CONSERVATION AND DEVELOPMENT OF THE RUINED OUTBUILDING TO SERVE AS A GARDENER’S WORKSHOP AND THE PROVISION OF A POLYTUNNEL ADJACENT TO IT; 4) CONSERVATION AND REPAIR OF THE FORMER PUMP HOUSE AND WINDMILL BASE TO THE WEST OF HAZELWOOD HOUSE ON THE SHORELINE WITH THE GARAVOGUE RIVER (PROTECTED STRUCTURE (RPS NO. 292SE); 5) PROVISION OF NEW VISITOR CAR PARKS, ONE TO THE EAST OF THE STABLEYARD AND ONE IN THE FORMER SAWMILL YARD, WITH ASSOCIATED LANDSCAPING, TO REPLACE EXISTING CAR PARK PROVIDING 156 NO. PARKING SPACES (INCLUDING 10 NO. ACCESSIBLE CAR-PARKING SPACES, 15 NO. EV PARKING SPACES, 4 MINI BUS SPACES AND 6 COACH SPACES) AND PROVISION OF SHELTERED ARRIVAL AREA UNDER A CANOPY STRUCTURE (19.38 SQ. M.); 6) PROVISION OF 24 NO. CYCLE PARKING SPACES AND SHELTERED, GATED PARKING (C. 81 SQ. M.) FOR SMALL SITE MAINTENANCE VEHICLES TO THE NORTH EAST OF THE NORTHERN RANGE OF THE STABLYARD; 7) THE EXPANSION OF THE DISTILLERY CAPACITY FROM 1 MILLION LITRES OF PURE ALCOHOL (MLPA) PER ANNUM TO 2 MLPA PER ANNUM COMPRISING: I) THE DEMOLITION OF A 7,212.6 SQ.
Alterations to front, side and rear elevations, roof and ridge height of existing dwelling. Part single-storey, part two-storey extension to rear and side of existing dwelling. Widening of existing vehicular entrance and all ancillary siteworks
Development consisting of the following; Permission to retain existing single storey detached structure on site used as a granny flat. Permission to extend existing structure to become permanent residential dwelling house with alterations to elevations of existing structure. Installation of new onsite wastewater treatment system to serve the property with all associated site works.
The brief summarizes the pattern across all 744 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21225The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief