Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
16% of nearby decided applications were refused. The site check found 2,200 decisions within 5 km, 1 exact-site or onsite candidate record, and 228 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Galway City Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Galway City Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Galway City Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
228 structured nearby appeal records.
228 matchedNo current-dated citation is loaded for Galway City Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission for development which will consist of construction of a dingle building containing 9 individual units in a single block (Total Area- 1001 sq.m) for use as warehousing/storage, distribution, retail of a type and scale appropriate to the area, offices/specialist offices, light industry and all other uses compatible with CI Zoned lands along with all ancillary site works and site services
Permission for development which consists of: construction of 2 No. individual units in a single block (Total Area- 230sq.m) for use as warehousing /storage, distribution, retail of a type and scale appropriate to the area, offices /specialist offices, light industry, and all other uses compatible with CI Zoned lands along with all ancillary site works and site services to the South of Block D, Glenrock Business Park, Bothar na Mine, Galway
Permission for development which consists of the construction of a new ESB Substation and transformer compound, modifications to the existing utility buildings, and associated site works to the rear of Building 1
Permission for development which consists of the construction of a new transformer compound, modifications to existing utility buildings, and associated site works, to the rear of Building 1
Planning permission for the development which will consist of works to Building 2 MOD 3 comprising: the construction of new floor area (540m2) at first floor level to be used as lab/ office space with 2 no. access stairs and a lift, all within the existing building, alterations to part of the south façade and the installation of rooflights in the existing roof.
Planning permission for the development which will consist of works to building 2, MOD 1 comprising the construction of a single-storey extension ( 91m2) to canteen area in the north elevation, fire escape staircase and installation of a rooflight, minor modifications to a previously granted compactor yard and minor site alterations
The brief summarizes the pattern across all 2,200 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21286The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief