Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 158 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
AN EXISTING 45M LATTICE COMMUNICATIONS STRUCTURE TOGETHER WITH ASSOCIATED EQUIPMENT AND COMPOUND AND PERMISSION TO ATTACH 3 NO. ANTENNA AND 2 NO. TRANSMISSION DISHES TOGETHER WITH ASSOCIATED EQUIPMENT AND CABINETS
AMENITY PROVISION DEVELOPMENT WHICH CONSISTS OF A 657M TIMBER BOARDWALK, 120M GRAVEL ACCESS PATH, POST AND RAIL BOUNDARY FENCING, INFORMATION SIGNAGE, 25M PARKING BAY, 1 NO. STANDARD STREET LIGHTING POLE AND ALL ASSOCIATED WORKS. A NATURA IMPACT STATEMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE APPLICATION
A DOMESTIC GARAGE
CONSTRUCTION OF 17 NO. HOUSES, CONSISTING OF 14 NO. SEMI-DETACHED TWO STOREY HOUSES, 3 NO. DETACHED BUNGALOW DWELLINGS. THE DEVELOPMENT WILL INCLUDE THE PROVISION FOR THE CONSTRUCTION OF SERVICE ROAD, FOOTPATHS, GRASS MARGINS, PUBLIC LIGHTING, OPEN SPACE, BOUNDARY WALL TREATMENT AND CONNECTING TO MAINS WATER, STORM WATER AND FOUL WATER SERVICES WITHIN THE ADJACENT 'ARD GLAS' HOUSING DEVELOPMENT AND TO CONNECT TO EXISTING SERVICES ON SITE AND ADJACENT SITE BOUNDARIES AND ALL ASSOCIATED SITE WORKS
CONSTRUCTION OF 24 NO. HOUSES, CONSISTING OF 16 NO. SEMI-DETACHED TWO STOREY HOUSES, 4 NO. SEMI-DETACHED BUNGALOW DWELLINGS AND 4 NO. DETACHED BUNGALOW DWELLINGS. THE DEVELOPMENT WILL INCLUDE THE PROVISION FOR THE CONSTRUCTION OF SERVICE ROAD, FOOTPATHS, GRASS MARGINS, PUBLIC LIGHTING, OPEN SPACE, BOUNDARY WALL TREATMENT AND CONNECTING TO MAINS WATER, STORM WATER AND FOUL WATER SERVICES WITHIN THE ADJACENT 'ARD GLAS' HOUSING DEVELOPMENT AND TO CONNECT TO EXISTING SERVICES ON SITE AND ADJACENT SITE BOUNDARIES AND ALL ASSOCIATED SITE WORKS
To extend the gardens of house numbers 17-20, by 7m to the northeast, from that previously granted under reference no. 22198 and all associated site works
The brief summarizes the pattern across all 158 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 214The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief