Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 1,025 decisions within 5 km, 1 exact-site or onsite candidate record, and 91 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
91 structured nearby appeal records.
91 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
(a) Retention permission for change of use of existing farm building to office use with canteen and WC. (b) Planning permission for new recessed vehicular entrance. Existing entrance to be closed up. (c) Planning permission for new 630sqm shed for agricultural use. (d) Planning permission for new proprietary wastewater treatment system and sand filter percolation area. (e) Planning permission for new surface water management works. Revised by Significant Further Information which consists of submission of a Natura Impact Statement
The construction of a single storey bungalow, domestic garage, recessed entrance, secondary effluent treatment system and all associated site works,
Construction of a two storey detached type house, one and a half storey detached type domestic garage with loft store, effluent treatment system, and all ancillary siteworks
For the construction of a solar PV development and an ‘under the fence’ transformer compound on a ca. 180ha site consisting of: I. Solar PV panels laid out in arrays across the Site; II. 39 No. inverter units (ca. 2.9m (h) x ca. 6.1m (l) and 2.4(w)); III. 1 No. control room structure (5m (h) x 15.3m (l) and 3.7m (w)); IV. 1 No. transformer unit (ca. 6m x ca. 4m) and associated bund; V. Security fencing around the ‘under the fence’ transformer compound (2.65m high); VI. Electrical and communications cabling; VII. Pole-mounted security cameras; VIII. Perimeter security fencing (2m high) and security gates; IX. Upgrade of 3 No. existing Site entrances; X. Development of 2 No. new Site entrances; XI. 3 No. temporary construction compounds; XII. Internal access tracks; and, XIII All associated ancillary development, landscaping and reinstatement works
Increasing the number of children catered for from 10 to 14 in line with Early Childhood Ireland ECCE Scheme
For (A) permission for 42 no. serviced camp sites, (B) erection of clubhouse building with indoor activity rooms, shop, coffee dock, cleaners store, reception area and staff toilet, (C) erection of 2 no. toilet blocks consisting of Gents and Ladies toilets and family changing areas with wash up area, (D) the installation of a septic tank, integrated constructed wetlands and percolation area (E) Permission is sought for 38 no. car parking spaces with 4 no. E car charging points, 20 covered cycle parking spaces and (F) access to the proposed site is off the existing private roadway granted planning permission under file ref no: 18/403 and all associated site development works. Revised by Significant Further Information which consists of Revised design of the reception building and toilet blocks.
The brief summarizes the pattern across all 1,025 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21579The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief