Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 246 decisions within 5 km, 1 exact-site or onsite candidate record, and 7 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Cavan County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Cavan County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Cavan County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
7 structured nearby appeal records.
7 matchedNo current-dated citation is loaded for Cavan County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For development consisting of: Installation and operation of a solar farm with an export capacity of approximately 8mw to include photovoltaic panels array with mounted steel frames on screw pile foundations, within an overall site area of 16.67ha, 10 no. Inverter station, substation, communications building, pole mounted security cameras, ducting & underground electrical cabling, boundary fencing and site entrance, together with all associated site works and services. The proposed lifetime of the project is 25 years. A Glare Assessment Report will be submitted to the planning authority with the application
To construct an agricultural building for the purposes of machinery and animal feed storage together with all associated site works. Significant further information and revised plans have been submitted.
To construct an agricultural building together with all associated site works
To erect a single storey extension to side of existing dwelling, and detached domestic garage and all ancillary site works
For construction of a storey and half dwelling, detached domestic garage, effluent treatment system, percolation area and all ancillary site works
For development consisting of the construction of a new split level part single and part two storey dwelling, detached domestic garage, wastewater disposal system, new site entrance and all associated site works
The brief summarizes the pattern across all 246 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21655The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.