Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 126 decisions within 5 km, 2 exact-site or onsite candidate records, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Construct a maintenance shed and all associated site works
Demolish existing redundant structures and construction of new (1) inlet works, (2) aeration tanks and clarifiers with flow splitter chamber, air blowers, sludge wasting pumps and sludge return pumps; (3) sludge drying reed beds; (4) Upgrades to mechanical and electrical components of existing tanks; (5) Installation of a GRP kiosk to house electrical control panel; (6) erection of new boundary fencing around the site; and all ancillary site works. A Natura Impact Assessment (NIS) have been submitted with this application.
Construct an Enterprise & Employment Park to provide 5 no. serviced sites, on a site of 2.95ha at Townparks, Borris-in-Ossory, Co. Laois. The proposed development includes; 1) the provision of vehicular, pedestrian/cycle access onto the existing R445, including the provision of a new arm off the R445 roundabout; 2) an internal road and footpath and cycle lane network; 3) site clearance & infilling of the land up to c101clm; 4) foul & surface water drainage; 5) landscaping & boundary treatment; 6) an ESB Substation; 7) lighting, signage & all associated site development works. A Natura Impact Statement (NIS) will also be submitted to the planning authority with the planning application.
Develop 5 no. serviced sites for 5 no. detached dwelling houses. The proposed development will also include boundary treatments, lighting, connections to foul, surface water drainage & water services, landscaping and all associated infrastructure works and services on 0.3 Ha
(1) construct a storey and a half extension to rear of the existing dwelling, and a new recessed site entrance & (2) retain existing single storey external utility room and existing single storey garage / store
Construct new dwelling house, domestic garage, new site entrance, treatment system and percolation area and all associated site works
The brief summarizes the pattern across all 126 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2169The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief