Executive snapshot
9% of nearby decided applications were refused. The site check found 2,248 decisions within 5 km, 1 exact-site or onsite candidate record, and 186 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
186 structured nearby appeal records.
186 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of duration for 15/697
The erection of illuminated signage on the eastern elevation of the existing boat house. The site is located circa 832m from Plassey House (protected structure) and circa 247m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within an architectural conservation area
The proposed upgrade of the existing Castletroy Wastewater Treatment Plant. This is a Strategic Infrastructure Development
Repairs to the pontoon and gangway adjacent to the UL Boathouse at Dromroe. The works involve the replacement of the existing decking and the installation of a security gate at the entrance to the pontoon. An Appropriate Assessment(AA) & Natura Impact Statement(NIS) will be submitted to the Planning Authority with the application
The installation of roof-mounted heat pumps and photovoltaic panels, with ancillary site works. The site is located circa 155m from Plassey House (protected structure) and circa 542m from Plassey Mill and Headrace (protected structure). The University of Limerick campus falls within an architectural conservation area
Of change of use of private domestic garage to bedroom and all associated site works
The brief summarizes the pattern across all 2,248 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 217002The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief