Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 257 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Extension of duration for 16/79 for the construction of a beef slatted house, slatted tank extensions and ancillary works on lands with a protected structure (Ref. No. 383)
The construction of a new dwelling, detached garage, the installation of a waste water treatment system, new vehicle entrance and all associated site works
The renovation and extension of existing dwelling house to include new windows and roof to existing dwelling house, decommissioning of existing septic tank system and the installation of a new replacement packaged wastewater unit with percolation area and all associated site works. Retention Permission for existing mobile home for use during construction period
Construction of a dwelling, garage, effluent treatment system, entrance and all associated site works
The replacement of a new roadside boundary and all associated site works within the curtilage of a Protected Structure. Retention Permission is also sought for the removal of the road side boundary
The demolition of the existing garage and existing kitchen extension & construction of new single storey extension to rear and side of existing dwelling, new single storey garage, new vehicle entrance, installation of wastewater treatment system and polishing filter and all associated site works
The brief summarizes the pattern across all 257 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 217016The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief