Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 129 decisions within 5 km, 2 exact-site or onsite candidate records, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of duration for 16/598 for construction of a dwelling house, domestic garage, bored well, effluent treatment system and percolation area, main entrance and associated site works
Extension of permission for planning ref. 16/598: construction of a dwelling house, domestic garage, bored well, effluent treatment system and percolation area, main entrance and associated site works - extended under 21/7018 until 08/01/2024
Demolition to existing derelict dwellinghouse, construction of a new two storey old style farmhouse in its place, carry out alterations and re-alignment of existing entrance, install a new waste water treatment system and percolation area
The construction of a single storey dwelling, detached domestic garage, site entrance, private well, wastewater treatment system & percolation area as per site assessment report and all ancillary site development works
Construction of a dwelling house, site entrance, wastewater treatment system & percolation area and all ancillary site works
The construction of an entrance, a storey and a half type dwelling house and detached garage, provision of a wastewater treatment system and all associated site works
The brief summarizes the pattern across all 129 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 217018The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief