Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
9% of nearby decided applications were refused. The site check found 252 decisions within 5 km, 8 exact-site or onsite candidate records, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of duration for 16/244 (as amended by planning permission 19/717) for the construction of 46 no. dwelling houses (10 no. 4 bed detached houses, 14 no. 3 bed town houses, 2 no. 2 bed & study houses and 16 no. 3 bed semi-detached houses) roads, infrastructure, landscaping and ancillary works associated with the site
Alterations and modifications to planning permission ref. 16/244 which consisted of permission for 46 no. two-storey dwelling houses (10 no. 4 bed detached houses, 14 no. 4 bed semi-detached houses, 4 no. 3 bed town-houses, 2 no. 2 bed and study town-houses and 16 no. 3 bed semi-detached houses). The modifications and alterations include an increase in density from 46 no. two storey dwelling houses to 56 no. two-storey dwelling houses consisting of 8 no. 2 bed town-houses, 12 no. 3 bed townhouses, 24 no. 3 bed semi-detached houses and 12 no. 4 bed semi-detached houses. The application includes roads, infrastructure, landscaping and ancillary works associated with the site
Modification to existing planning permission permitted for the construction of 56 no. dwelling units permitted under planning permission references: 16/244 and 19/717 and extended under planning permission reference 21/7031 at Skagh, Croom, Co. Limerick. The proposed modifications include: (1) revised positioning of permitted units along the eastern boundary and revised arrangement of house types of permitted unit nos. 40-41 and 54-56 along that boundary to allow for; provision of: 12 no. semi-detached units, 3 no. terrace units and 2 no. detached units (17 in total), in lieu of the permitted 14 no. semi-detached units and 3 no. terrace units (17 in total). (2) repositioning of units 16-19 (inclusive) to provide separation distance from existing sub-surface pipe infrastructure; (3) change of house design including; modification to permitted units Nos. 14, 17, 18, 21, 22, 25 and 32, from 2-bedroom mid-terrace units to, 3-bedroom mid-terrace units; and (4) minor revision to alignment of; (i) permitted internal road layout and (ii) hammerhead turning area and geometry. no change is proposed to the permitted unit numbers
The construction of an entrance, a dwelling house, connection to mains services and associated site works
The construction of an entrance, dwelling house, connections to mains services and associated site works on serviced site
The construction of an entrance, a dwelling house, connection to mains services and associated site works
The brief summarizes the pattern across all 252 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 217031The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief