Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 164 decisions within 5 km, 5 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matched1 of 2 layers are loaded for Clare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Clare County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Clare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Clare County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For the construction of a new single/part two storey dwelling house and garage. This application also seeks permission for new site entrance with gates, access roadway, connection to existing public services, removal of section of front boundary, provision of new boundary walls and fences and all ancillary hard and soft landscaping and site works
For the construction of a two storey detached dwelling house with a single storey detached garage including new entrance gates and piers, hard and soft landscaping, new front boundary wall, connections to public sewer and all ancillary site works
For the construction of a two storey detached dwelling house with a single storey detached garage including new entrance gates and piers, hard and soft landscaping, new front boundary wall, connections to public sewer and all ancillary site works
For the construction of a new two storey dwelling house and garage and PERMISSION for new site entrance, gates, access roadway, connection to existing public services, removal of selected boundaries, provision of new boundary walls and fences and all ancillary hard and soft landscaping and site works
For the construction of amendments to the existing site entrance to our lands at Teeronea, Kilkishen, Co. Clare. This application seeks permission for the construction of amendments to the existing site entrance including permission for partial removal of existing hedgerow and boundary walls, widening and re-profiling for improved sight lines for vehicular access, a new pedestrian entrance/s and footpaths, provision of site services, site lighting and all ancillary site works
For the construction of a two storey detached dwelling house with a single storey detached garage including new entrance gates and piers, hard and soft landscaping, new front boundary wall, connections to public sewer/services and all ancillary site works
The brief summarizes the pattern across all 164 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21754The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief