Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 984 decisions within 5 km, 1 exact-site or onsite candidate record, and 78 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
78 structured nearby appeal records.
78 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Junction improvement works on the R445(Dublin Road)/R506(Cappamore Road), Limerick. The proposed works will include the construction of new footpaths, new cycle lanes, new junction slip lanes, new controlled pedestrian crossings, new public lighting scheme, new surface water drainage system, improved road markings, new traffic signal control, signage and carriageway resurfacing
Demolition of existing one storey dwelling house consisting of kitchen, living and bedroom areas and site entrance
The removal of 2no. existing prefabricated classrooms and the construction of 2no. new prefabricated classrooms and all associated ancillary site works
The (a) Construction of new single-storey 6-bedroom children’s respite home facility with exterior store / plantroom. (b) Site development works including landscaping, play area, new vehicular access and pedestrian access with set-down area, car parking, footpaths, water services connections and site boundaries
Construction of a new temporary pre-fabricated multi-sensory room and all associated ancillary site works
Construction of two new temporary pre-fabricated classroom accommodation and all associated ancillary site works
The brief summarizes the pattern across all 984 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 218009The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief