Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 116 decisions within 5 km, 1 exact-site or onsite candidate record, and 3 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
3 structured nearby appeal records.
3 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
CONSTRUCTION OF A NEW DWELLING HOUSE, DOMESTIC GARAGE/FUEL SHED, INSTALL SEPTIC TANK WITH PERCOLATION AREA AND ALL ANCILLARY SITE WORKS
CONSTRUCTION OF A SINGLE STOREY DETACHED DWELLING WITH A STOREY AND A HALF MEZZANINE, DETACHED GARAGE, UPGRADE AN EXISTING ENTRANCE OFF THE PUBLIC ROAD, PROPRIETARY WASTEWATER TREATMENT SYSTEM AND PACKAGED SECONDARY UNIT AND ALL ANCILLARY SITE WORKS.
WORKS TO A PROTECTED STRUCTURE, NAMELY, EXTENSION TO THE REAR OF EXISTING PUBLIC HOUSE TO CREATE FAMILY LIVING QUARTERS COMPRISING OF ENTRANCE, UTILITY AND WC, KITCHEN/DINING AREA, LIVING ROOM, 3 BEDROOMS LOCATED ON THE FIRST FLOOR AND ALL ANCILLARY WORKS
CONSTRUCTION OF A NEW DWELLING, DOMESTIC GARAGE, PROPRIETARY EFFLUENT TREATMENT SYSTEM & POLISHING FILTER, NEW ROAD ENTRANCE AND ALL ANCILLARY SITE WORKS
THE ERECTION OF DWELLING HOUSE WITH PROVISION FOR FUTURE DEVELOPMENT OF ATTIC, INSTALLATION OF EFFLUENT WASTE WATER TREATMENT SYSTEM INCLUDING PERCOLATION SYSTEM, NEW ENTRANCE AND ALL ANCILLARY WORKS
CHANGE OF USE FROM PRE-SCHOOL SESSIONAL SERVICES TO INCLUDE PART TIME SERVICES AND AFTERSCHOOL SERVICES. THIS INCLUDES EXTENDING HOURS FROM 9AM TO 12AM (MON-FRI), TO 9AM TO 2PM (MON-FRI) AND AN AFTER SCHOOL SERVICE FROM 2PM TO 6PM (MON-FRI) AND NEW ASSOCIATED SIGNAGE
The brief summarizes the pattern across all 116 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 21802The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief