Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 110 decisions within 5 km, 1 exact-site or onsite candidate record, and 1 structured appeal.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
1 structured nearby appeal record.
1 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(A) demolish existing rear extension and detached store, (B) construct a part 2-storey, part single storey extension to side and rear of existing 2 storey farm house, (C) decommission existing septic tank and install a proprietary wastewater treatment system and all associated site development works
Change external material on existing cottage to change from Render to Natural stone and from natural stone to timber on the kitchen annex as well as moving the kitchen annex window on the East Elevation and the removal of the existing chimney.
Install a septic tank and percolation area, demolition of the front porch and the replacement of the side annex of the existing house with a new 21 sq m extension, the provision of a 135sq.m. extension to the rear of the property and associated site works
Retain domestic garage carport, sheds and all associated site works
(1) construct new extensions to an existing farm building for housing livestock including a new internal underground single slatted slurry storage tank and a new internal underground double slatted slurry storage tank, completed with associated siteworks, (2) construct a new farm building for housing livestock including a new internal underground single slatted slurry storage tank, completed with associated siteworks, (3) construct a new farm building for general storage use, completed with associated siteworks, (4) replace existing silage slab with a new silage slab including a side retaining wall, completed with associated siteworks, and (5) construct a new animal feeds storage silo, completed with associated siteworks. A NIS has been received on this application on request of a Section 177 T (5).
Two Storey Extension to house
The brief summarizes the pattern across all 110 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21855The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief