Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 206 decisions within 5 km, 3 exact-site or onsite candidate records, and 10 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
10 structured nearby appeal records.
10 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
(A) CONSTRUCT A COMMERCIAL BUILDING OVER THREE LEVELS TO INCORPORATE BRONA CHOCOLATE FACTORY ON THE GROUND AND FIRST FLOOR LEVEL WITH BRONA CAFE ON THE UPPER FLOOR LINKING TO PROPOSED GREENWAY TRAIL (B) INSTALL EXTERNAL LIFT CONNECTING TO PROPOSED BUILDING WITH EXTERNAL STAIRWELL AND RAMPED ACCESS WITH HARD AND SOF LANDSCAPTED AREAS (C) INSTALLATION OF ONSITE MECHANICAL TREATMENT UNIT AND POLISHING FILTER SYSTEM WITH ALL REQUIRED SITE WORKS (D) ERECT SIGNAGE SERVING THE PROPOSED FACILITY (E) CONSTRUCTION ON NEW SITE ENTRANCE AND CARPARKING FACILITIES WITH ALL ASSOCAITED STIE WORKS
Planning Permission for the change of building design from that previously Granted Permission under Planning Reference Number 22/926, The changes to the commercial building includes a reduction from a permitted 3 storey building to a single storey building, incorporating Brona chocolate factory, visitor’s centre and Brona cafe on the ground floor level, the omission of the upper floor terrace linking to the proposed greenway trail, (b) omission of external lift, (c) elevation changes that include sheltered outdoor seating area and (d) the provision of a covered loading bay with all associated site works
(A) CONSTRUCT A COMMERCIAL BUILDING OVER THREE LEVELS TO INCORPORATE BRONA CHOCOLATE FACTORY ON THE GROUND AND FIRST FLOOR LEVEL WITH BRONA CAFE ON THE UPPER FLOOR LINKING TO PROPOSED GREENWAY TRAIL, (B) INSTALL EXTERNAL LIFT CONNECTING TO PROPOSED BUILDING, WITH EXTERNAL STAIRWELL AND RAMPED ACCESS WITH HARD AND SOFT LANDSCAPED AREAS, (C) INSTALLATION OF ONSITE MEHCANICAL TREATMENT UNIT AND POLISHING FILTER SYSTEM WITH ALL REQUIRED SITE WORKS (D) ERECT SIGNAGE SERVING THE PROPOSED FACILITY, (E) CONSTRUCTION OF NEW SITE ENTRANCE AND CARPARKING FACILITIES WITH ALL ASSOCIATED SITE WORKS. A NATURA IMPACT STATMENT (NIS) WILL BE SUBMITTED TO THE PLANNING AUTHORITY WITH THE PLANNING APPLICATION.
RETENTION PERMISSION TO RETAIN FARM ACCESS ROAD ON SITE AND ASSOCIATED SITE WORKS
CONSTRUCT A SINGLE STOREY DOMESTIC DWELLING HOUSE. PERMISSION IS FURTHER SOUGHT TO CREATE A NEW DOMESIC SITE ENTRANCE WITH GATES AND PILLARS, A NEW ACCESS ROAD; THE INSTALLATION OF A NEW MECHANICAL TREATMENT UNIT, INTERMITTENT FILTER AND POLISHING FILTER; AND ALL ASSOCIATED ANCILLARY SITE DEVELOPMENTS INCLUDING LANDSCAPING AND BOUNDARY TREATMENTS
(1) Demolish Existing rear extension (2) Construct an extension to the rear (3) Decommission existing septic tank (4) Install a new waste water treatment system (5) Alteration to elevations (6) All associated site works
The brief summarizes the pattern across all 206 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 21939The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief