Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 371 decisions within 5 km, 4 exact-site or onsite candidate records, and 29 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Wicklow County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matched2 current citations from the Wicklow County Council development plan, each with section, page and source URL.
2 matched3 of 4 layers are loaded for Wicklow County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
29 structured nearby appeal records.
29 matchedCitations are current-dated and carry policy name, section, page and source URL from the Wicklow County Council development plan.
2 matchedOpen preview
Open preview
Minor alterations to the dwelling redevelopment as permitted under planning permission Reg. Ref. 19/187. The alterations for retention include for replacing the permitted stone finish with zinc cladding, the repositioning of the front door/porch, other minor fenestration revisions and for a free-standing solar array in the rear garden
Altering the ground floor plan of the existing single storey dwelling by including a small extension to straighten front and to remove two bay windows at the front. Build first floor extension over the ground floor revising all elevations accordingly. Upgrade existing septic tank and percolation area to current EPA guidelines. Extend existing garage by adding a hay and feed store and 2 stables. Dungsted and all associated site works
First floor extension over the existing single storey dwelling, a small single storey extension to rear, to remove the existing bay windows to front, to incorporate revised fenestration details to the ground floor element, and for all associated site works
Minor alterations to the original garage and extension to same as permitted under planning permission Reg. Ref. 19/187. The alterations for retention include for replacing the permitted timber finish with plaster finish, minor fenestration revisions and the addition of a shower room
Change of use (removal of condition 2A of planning reference 08/2088) from restricted use as a dwelling to use by all classes of persons
Dormer bungalow, entrance, on site sewage treatment system and relocation and replacement of existing septic tank and all associated site works
The brief summarizes the pattern across all 371 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221028The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief