Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 305 decisions within 5 km, 2 exact-site or onsite candidate records, and 25 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
25 structured nearby appeal records.
25 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
(A) RETAIN WORKS CARRIED OUT TO DATE ON A DOMESTIC GARAGE/UTILITY/OFFICE BUILDING (B) RETAIN THE LOCATION OF THE EXISTING WASTEWATER TREATMENT UNIT AND PERCOLATION AREA (C) RETAIN EXISTING VEHICULAR ENTRANCE SERVING THE DWELLING, (D) RETAIN EXISTING DWELLING HOUSE WITHIN REVISED BOUNDARIES AS PREVIOUSLY GRANTED UNDER PLANNING REG. 07/1458 AS WELL AS FULL PLANNING PERMISSION TO COMPLETE ALL OUTSTANDING WORKS TO THE DOMESTIC GARAGE/UTILIY/OFFICE BUILDING
TO (A) RETAIN EXISTING DWELLING HOUSE WITHIN REVISED BOUNDARIES AS PREVIOUSLY FRANTED UNDER PLANNING REG. 07/1458 (B) RETAIN WORKS CARRIED OUT TO DATE ON A DOMESTIC GARAGE/UTILITY/OFFICE BUILDING AS WELL AS FULL PLANNING TO (A) COMPLETE ALL OUTSTANDING WORKS TO SAID DOMESTIC GARAGE/UTILITY/OFFICE BUILDING (B) DE-COMMISSION THE EXISTING WASTEWATER TREATMENT UNIT ON SITE AND REPLACE IT WITH A NEW SEPTIC TANK AND UPDATED PERCOLATION AREA IN ACCORDANCE WITH NEW SITE CHARACTERISATION TEST FINDINGS ALL AT
CONSTRUCT AN EXTENSION TO AN EASY FEED SLATTED HOUSE COMPLETE WITH CUBICLES SLATTED SLURRY TANK AND FEED BARRIER AND ALL ANCILLARY SITE WORK
(A) DEMOLISH INSITU EXTENSION TO REAR OF EXISTING DWELLING HOUSE AND EXTERNAL PORCH TO FRONT OF EXISTING DWELLING HOSUE; (B) PERMISSION TO CONSTRUCT A NEW SINGLE STOREY EXTENSION TO THE REAR OF THE EXISTING DWELLING AND ASSOCICATED ELEVATIONAL CHANGES TO EXISTING DWELLING HOUSE AND (C) PERMISSION TO DECOMMISSION THE EXISTING SEPTIC TANK AND INSTALL A MECHANICAL TREATMENT UNIT AND RAISED SAND POLISHING FILTER TO SERVE THE EXTENDED DWELLING ALONG WITH ALL ASSOCIATED EXTERNAL WORKS
BUILD A PRIVATE SINGLE STOREY DWELLING WITH ATTIC ACCOMMODATION SERVED WITH SEPTIC TANK AND PERCOLATION AREA AND ALL ASSOCIATED SITE WORKS
RETAIN HER AGRICULTURAL ENTRANCE AS BUILT AND PLANNING PERMISSION TO COMPLETE THIS ENTRANCE ALONG WITH ASSOCIATED SITE WORKS
The brief summarizes the pattern across all 305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221088The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief