Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
37% of nearby decided applications were refused. The site check found 225 decisions within 5 km, 1 exact-site or onsite candidate record, and 12 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
12 structured nearby appeal records.
12 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
For a 10-year permission, for the construction and operation of a renewable energy development within a site boundary of c. 114 ha. The proposed development will consist of a development area of circa 71.7 ha including solar on fixed on ground mounted frames with a maximum height of 3 metres, 1 No. battery storage compound, 1 No. customer switchgear container, 1 No. 110kv grid connected single storey substation, 1 No. single storey customer substation and all associated electrical plant, inverter units, electrical transformers, battery units, cooling equipment, underground cabling and ducting, boundary fencing, security entrance gates, CCTV, upgrading of existing access road and new internal access roads and all associated ancillary activities. The proposed development will have a 35-year operational life from the date of commissioning. Revised by significant further information which consists of Provision of quantum of energy export (of up to 80MW) in the proposed development and storage capacity of proposed battery compound (of up to 80MWh). Clarification of energy export (of up to 15MW, no battery storage) of adjacent permitted development 15/1172 (extension of duration under 20/1052); Submission of details of adjacent permitted development 15/1172 (extension of duration under 20/1052); Provision of details of minor works to site entrance, construction traffic warning signage to public roadway, at proposed site entrance and also within internal haul routes; Clarification of extent of private roadway (haul roads) within the site; Provision of a fire risk assessment of hazards for on or near the solar array and battery storage compound; Provision of programme/schedule of works for proposed development and adjacent permitted development 15/1172 (extension of duration under 20/1052; Provision of amended Archaeological Impact Assessment. Provision of draft Construction Traffic Management Plan; Provision of Independent Road Safety Audit Stage 1/2; Provision of amended preliminary Construction and Environment Management Plan; Provision of Preliminary Public Liaison Engagement Plan
For an amendment to the granted planning (Planning Reference: 221203) which comprised consent for a solar PV energy development and battery storage compound at Coolcarrigan, Timahoe West, Co. Kildare. Proposed amendments include; (1) An increase in the quantum of energy export that the solar park can produce from 80MW to up to 120MW (2) an amendment to the wording of the battery energy storage from 80MWh to up to 80MW, which amends the power output from the energy capacity to the rated power, to provide battery energy storage to greater flexibility in how it imports and exports the electricity to the grid (3) clarification of adjacent permitted development 15/1172 (extension of duration under 20/1052) increasing the energy export from 15MW to upp to 19.4MW)
For construction of a new 4 Bedroom dormer dwelling, Detached Garage, Effluent waste treatment system, proposed new entrance and all associated site development works
The construction of a new 4 Bedroom dormer dwelling, Detached Garage, Effluent waste treatment system, proposed new entrance and all associated site development works
Of conversion of the garage at rear to a single occupancy community dwelling in contravention of Condition 2 of permission reference 16/1251, addition of entrance door to side elevation and change of window to rear elevation of garage, construction of vehicular entrance and sliding gate to front boundary with laneway access to rear along west boundary and addition of hardstanding car parking to rear of converted garage for approximately 12 cars; demolition of double garage and shed to rear; relocation of percolation area
To construct dormer bungalow, domestic garage, Oakstown waste water treatment system and percolation area, shared access and all associated works and services
The brief summarizes the pattern across all 225 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221203The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief