Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,803 decisions within 5 km, 1 exact-site or onsite candidate record, and 156 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
156 structured nearby appeal records.
156 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
(a) completion of the existing shell and core building that was previously granted under PI.Reg. 072395, (b) change of use from retail warehousing to a gymnasium with all associated services, (c) construction of a new partial mezzanine floor at first floor level to serve as a part of the gymnasium with all associated services, (d) minor elevational changes to the existing building inclusive of proposed signage, (e) extension of the existing access road and construction of a new car parking area to the front of proposed entrance(s), (f) proposed relocation of Plant Room, (g) connection to all existing services already terminated within the building and all associated site works
A high-power electric vehicle charging hub & associated infrastructure, consisting of the following: i) installation of 4no. electric vehicle bays, (ZEVI compliant) & 4no. charging points (powered by 100% renewable energy), (ii) new modular ESB substation & (iii) landscape renewal
The construction of a single storey car showroom and for 2 no. external car display areas with covered canopies, car parking, site lighting, building signage, 1 no. totem sign, connect to existing wastewater network, all with associated site development works
Of a change of use from retail use (12sq.m) to retail with ancillary off Licence use
Extension of permission for planning ref. 16/1: the demolition of 95sqm. of unoccupied floor space and the demolition of entrance structures and canopies; the change of use of unoccupied floor space (7,328sqm.) (in addition to part of the existing car park) from retail and related used to education and training use with related ancillary enterprise and innovation uses and ancillary café use (140sqm.). The development will also consist of the following: additional floor space at ground level (100sqm.) and at first floor level, within the existing building envelope (2,751sqm.) for education and training use with related ancillary enterprise and innovation uses; bike storage areas (58sqm.); storage area (44sqm.); elevational amendments, including new opes and signage; revised internal layouts; alterations to existing roof profile (without increasing the maximum height of the building); provision of roof plant; new service yard to the south; bus shelter; all hard and soft landscaping; revisions to existing car park; external lighting; boundary treatments; changes to levels; and all associated development above and below ground. The gross floor space of the new educational facility (including ancillary café use and external storage areas) will be 10,281sqm.
The construction of a vehicle service area 279.225sqm, to include customer waiting facilities, site fencing & signage, an ancillary space for the adjacent commercial gymnasium 92.225sqm and all associated site works
The brief summarizes the pattern across all 1,803 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221209The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief