Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
25% of nearby decided applications were refused. The site check found 151 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated services. Gross floor space of proposed works: 233.95sqm
To construct a private dwelling house, proprietary effluent treatment system, percolation area and domestic garage along with all associated services. Gross floor space of proposed works: 295 sqm
To (1) demolish existing dwelling house and replace with a new dwelling house on revised site boundaries (2) retain existing mobile home on site on a temporary basis until completion of proposed dwelling house (3) installation of new effluent treatment system and polishing filter (4) new site entrance as well as all ancillary site works. This application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 259.00 sqm. Gross floor space of any demolition: 85.00 sqm
To construct a new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 270.75 sqm (House) and 36.00 sqm (Garage)
To construct a new dwelling house, garage, effluent treatment system and polishing filter as well as all ancillary site works. This planning application is accompanied by a NIS, as required by Article 239 of the Planning and Development Regulations, 2001 (as amended). Gross floor space of proposed works: 270.75 sqm (House), 36.00 sqm (Garage)
To construct a dwelling house with garage and septic tank with wastewater treatment system. An NIS report will be included in the application. Gross floor space of proposed works: 206sqm.
The brief summarizes the pattern across all 151 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221220The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief