11% of nearby decided applications were refused. The site check found 1,031 decisions within 5 km, 1 exact-site or onsite candidate record, and 80 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
80 structured nearby appeal records.
80 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The development will consist of 1. Construction of a new two-storey Nursing Home of 156 no. bedrooms with a Gross Floor Area (GFA) of 8,576m2, including vehicular drop off area and service road. 2. Construction of a new three-storey Primary Care Centre (PCC) with a Gross Floor Area (GFA) of 3,049m2, including vehicular drop-off area. 3. The development includes a shared surface car park providing 161 no. car parking spaces (comprising of 151 no. standard car parking spaces and 10 no. accessible car parking spaces) and approximately 160 no. bicycle parking spaces. 4. Provision of foul and surface water drainage including an underground wastewater pumping station. 5. Connection to potable water supply at Kildare Bridge. 6. Provision of communal (semi-private) and public open space. 7. Provision of hard and soft landscaping including amenity equipment, fencing and gates. 8. Provision of substation and public lighting. 9. Proposed road improvement and realignment works along the R157 which abuts the Carton Demense Wall which is a Protected Structure (RPS Ref 91556), including: i. Construction of a new 2-way, 6m-wide access road from the R157 Dunboyne Road to include a priority T-junction on the Rl57 which includes a right-turn lane from the R157 into the access road, ii. Upgrade works to a section of the Rl57 from the new site entrance south to Kildare Bridge on the R157 (representing delivery of a 15m-wide portion of the Maynooth Outer Relief Road (MOOR)), including creation of a new 2m -wide footpath, 3m-wide cycle lane and pedestrian and cycle link adjacent to Kildare Bridge, iii. Provision of pedestrian and cycle improvement measures. 10. All other site development works and services ancillary to the proposed development. 11. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the planning application. Significant Further Information/revised plans submitted on this application
For the construction of converted attic structure and associated works. Converted works include new bedroom, WC and office space with 1 velux window on front roof elevation and 2 velux windows on rear roof elevation and a new window at second floor level on the gable
For the construction of converted attic structure and associated works. Converted works include new bedroom, WC and office space with velux windows on front and rear roof elevations
STRATEGIC HOUSING DEVELOPMENT (ABP Decision): 194 residential units (119 houses and 75 apartments), creche of c.305 sq. m.
The proposed development will consist of 3 no office blocks and all associated site development works (GFA. 20,633 26m2) as follows; 1. Block A: 5 storey office building providing offices, stair and lift cores and plant rooms (GFA 10,260.42 m2) 2. Block B: 3 storey office building providing offices, stair and lift cores and plant rooms (GFA 5,186.54 m2). 3. Block C: 3 storey office building providing offices, stair and lift cores and plant rooms (GFA 5,186.30 m2). 4. The development includes a surface car park which includes 323 no. car parking spaces and 320 no. bicycle car parking spaces (including 16 no. accessible car parking spaces and 12 no. EV charging spaces). 5. Undertaking of road upgrade works including the provision of a signalised junction on the R157 Dunboyne Road and the construction of a section of the Maynooth Outer Orbital Route and provision of associated pedestrian and cycle infrastructure, as well as a realignment of a section of the R157. The works to the R157 adjoin the Carton Demesne Wall which is a Protected Structure (RPS Ref 91556). 6. Vehicular access to the site will be provided via the R157 Dunboyne Road and provision is made for a secondary vehicular access via the proposed section of the Maynooth Outer Orbital Route. 7. Provision of water, foul and surface water drainage infrastructure including pumping station. 8. Provision of a new pedestrian & cycle bridge structure at the River Rye Water adjacent to the existing Kildare Bridge. 9. Provision of roof mounted solar PV panels on Office Blocks A, B & C. 10. Provision of 3 no. ESB Kiosks. 11. Provision of bin stores. bike stands, landscaping, boundary treatments and public lighting and all other site development works and services ancillary to the proposed development. 12. A Natura Impact Statement (NIS) and Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the planning application. Significant Further Information/revised plans submitted on this application
For development at a site of c. 0.114 hectares within previously permitted development at Dunboyne Road, Maynooth. The development will consist of revisions to Planning Reg. Ref. ABP 310865-21 comprising: replace 4 No. 3-bed terrace homes and 2 No. 3-bed semi-detached homes with 6 No. 3-bed terraced homes and associated car parking - no additional units are proposed; and associated works
The brief summarizes the pattern across all 1,031 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221251The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.