Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
21% of nearby decided applications were refused. The site check found 814 decisions within 5 km, 1 exact-site or onsite candidate record, and 49 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
49 structured nearby appeal records.
49 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct three no. industrial units in 1 block on site D2, with ancillary offices, a new vehicular road entrance, car and bicycle parking, boundary treatments, and all ancillary associated works
For constructing a car-wash bay with a 1.8m high surrounding wall on 5 No existing car-parking spaces, and all associated ancillary site-works
For retention consists of enclosed internal stairs, and mezzanine first floor levels for Unit C Warehouse (additional floor area = 58 sq.m.) and Unit F Warehouse (additional floor area = 87 sq.m,) and all associated services alterations
For retention planning permission for retaining and completing Industrial Units 6,7 and 9-12 incl. with warehousing / factory space and office space on two floors in Block 4 and Block 5, currently under construction and granted under planning permission 05/576 and extended under planning file 12/113, 17/1126 & 21/1347 and all associated ancillary site-works and full planning permission for Industrial Units 13-20 incl. with warehousing / factory space and office space on two floors in Blocks 6, 7 & 8, an additional entrance and all associated ancillary site-works as previously granted under planning permission 05/576 and extended under planning file 12/113, 17/1126 & 21/1347
Will consist of; 1) A new rear extension, 2) Extension to accommodate two new coach / bus service bays, store room, shower / locker room, WC., 3) All alterations, internal modifications and all associated site works.
Partial change of use of existing warehouse to office use. The works consists of (A) Planning permission for new canteen and staff toilet/shower room to be provided on ground floor. Remainder of ground floor to be used for storage of building materials. (B) New first floor offices, meeting room and new rooflight in the existing roof to light first floor (C) New signage to the front (east) elevation. Revised by Significant Further Information which consists of amendment to red line boundary
The brief summarizes the pattern across all 814 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221297The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief