Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
2% of nearby decided applications were refused. The site check found 162 decisions within 5 km, 1 exact-site or onsite candidate record, and 0 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
No structured appeal row is currently tied to the matched decision set.
No current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The construction of a new dwelling house, detached domestic garage, waste water treatment unit and polishing filter, enlarge existing entrance, and all associated site works
The construction of an 18 metre high free standing communications structure with its associated antennae, communication dishes, ground equipment and all associated site development works. The development will form part of Eircom Ltd. existing telecommunications and broadband network
(a) construction of storey and a half dwelling house with partial two storey gabled element to front and rear and single storey element to rear, (b) new detached domestic garage, (c) new on-site wastewater treatment system with polishing filter, (d) new vehicular entrance and (e) all ancillary site works
Construction of a poultry house, soiled water storage tank, new vehicular entrance and carry out all associated ancillary site works
Changes to previously approved permission ref. 17/445 comprising of (a) raising the eaves height and lowering the pitch of the main roof, (b) adding a second gable, including 2 no. new first floor windows, to the front elevation, (c) relocating 2 no. velux roof lights to the main roof, front and rear, (d) raising the height of the single storey front porch and amending the windows to same, (e) relocating 2 no. first floor windows and omitting 1 no. ground floor window to side (north) elevation, (f) adding 2 no. dormer roofs and windows to the rear elevation, (g) adding 1 no. new door to the rear elevation at ground floor level, (h) changing 2 no. windows to 1 no. door to the rear elevation and (i) increase in gross floor area by 30sq. m. over both stories
Change of house type from previously approved under planning permission 19/788 and for planning permission for the construction of a domestic garage and all ancillary site works
The brief summarizes the pattern across all 162 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221371The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief