Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
13% of nearby decided applications were refused. The site check found 595 decisions within 5 km, 1 exact-site or onsite candidate record, and 56 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
56 structured nearby appeal records.
56 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolition of the existing structure to the north of the site, (c.62.5sq.m) and the construction of 49 no. 2 storey residential units comprising of 6 no. 4 bed semi detached houses (c.130sq.m each), 25 no. 3 bed semi-detached/terraced houses (c112sq.m each), 14 no. 2 bed semi-detached/terraced houses (c.85sq.m each), 2 no 1 bed ground floor apartments (c.52sq.m each) and 2 no. 1 bed first floor apartments (c53sq.m each). A total of 91 car parking spaces are proposed which includes 5 no. accessible car parking spaces, 3 no. EV car parking spaces and 3 no. visitor spaces. Bicycle parking to the rear of each unit. 1 no. ESB substation is proposed to serve the development. In total the proposal provides for 2,879sq.m of public open space through 3 no. areas throughout the site. Waste water connection will be provided via the private waste water treatment plant at the existing Heatherside development to the west.. All associated site works, service provisions, drainage works, vehicular access to the north west from the existing Heatherside Residential Development (under construction), all internal roads and footpaths, bin stores, landscaping, boundary treatment works and public lighting serving the proposed development.
Detached 2-storey split-level dwelling with single storey car port & new wastewater treatment system to current EPA standards together with all ancillary site works including a new vehicular entrance from existing access road
Single storey detached outbuilding to the rear of the existing dwelling along with all associated site development works
Replacement of 1 no. detached house (House Type B) & 2 no. semi detached houses ( House Type A) at site no's 20,21 & 22 The Drive to 3 no. detached houses (Type PBd) together with all associated site works within an existing estate (Heatherside being constructed at present) pursuant to Plan Reg. Ref 08/610066, 13/610035, 19/373
Extend the appropriate period of a permission - 08/78 - 2 no. bungalow type dwellings with connection to existing council services (10 year permission sought)
Retain attic conversion to habitable rooms including velux roof lights to front and rear of property and associated site works
The brief summarizes the pattern across all 595 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 221387The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief