Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
17% of nearby decided applications were refused. The site check found 772 decisions within 5 km, 6 exact-site or onsite candidate records, and 70 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matched1 of 2 layers are loaded for Kildare County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kildare County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kildare County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
70 structured nearby appeal records.
70 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kildare County Council development plan.
1 matchedOpen preview
Open preview
To renovate and extend existing dwelling house consisting of converting front door to a window and replacing another window with a door, also to demolish existing extension to the rear and demolish outbuildings and construct a two storey extension with single storey elements and a domestic garage, decommission existing septic tank and install a proprietary wastewater treatment system and polishing filter, also lower front boundary wall and ground behind to provide sight lines and all associated and necessary site works
For retention and completion of extension to dwelling previously granted permission planning reference 22/1398 including change of design, namely to remove the first floor element of the extension to the rear and all associated and necessary site works
For (a)Traditional 2 storey farm house, domestic garage, new site entrance, landscaping, effluent treatment plant and all associated site development works (b) Removal of condition 3 from planning permission 12/635 (sterilisation of lands on which we propose to build the proposed house). Revised by Significant Further Information which consists of: Change of house design to single storey house type and removal of garage
To extend over a single storey cottage by demolishing existing roof to create a storey and a half style dwelling. Revised by Significant Further Information which consists of a new septic tank and percolation area being proposed
Constructing a one and a half storey dwelling, new waste water treatment system, new vehicular entrance and all ancillary site works
Proposed rear single storey extension, alteration of front façade window to doorway opening for emergency egress with associated adaptation internal alterations for disability use by family member, associated site development works to existing detached bungalow dwelling house
The brief summarizes the pattern across all 772 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 221398The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief