Applications tied to the site
Partial coverage8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
3% of nearby decided applications were refused. The site check found 226 decisions within 5 km, 8 exact-site or onsite candidate records, and 6 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
8 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
8 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
6 structured nearby appeal records.
6 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Construct 11 dwelling units consisting of 4 no. 2 bedroom Duplex Units (modification of previously approved permission 19/77, including partial demolition to rear of existing building) & 7 no 2 bedroom bungalows, refuse storage, bicycle storage, provision of roads and footpaths including works to existing carpark at Wallis Street, rearranging carparking and forming a new entrance to the subject site, new entrance feature on Wallis street to existing residential development, surface level car parking, public lighting, landscaping, public open space, boundary treatments, provision of foul and surface water disposal and all associated site works
(a). demolish existing single and two storey rear extensions to Morrins/Oldtown House (b). change the use of the existing retail area to residential use at Morrins (c) construct a two-storey rear/north-east extension & refurbishment of the existing to provide 4 no. 2 bed apartment units with new site entrance from Wallis Street, bin & bike storage, car parking and communal open space areas and to include all associated site works
Construct a part single storey and part 2 storey extension to the rear if property together with modifications and refurbishment works to existing premises [a protected structure]
Amend previously approved Planning Ref. 25/60168 to include revised fenestration and provision of new entrance doorway to front elevation and all associated ancillary works
Change use of existing disused public house area to use as a restaurant and take away and all associated ancillary signage and site works
Complete internal works, front, side & rear façade changes to subdivide existing building into 3 no. townhouses (1 no. 2 bed & 2 no. 3 beds) and all associated site works.
The brief summarizes the pattern across all 226 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22160The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief