Applications tied to the site
Partial coverage4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 864 decisions within 5 km, 4 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
4 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
4 matched1 of 2 layers are loaded for Laois County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Laois County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Laois County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedNo current-dated citation is loaded for Laois County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Develop at 7-8 Well Road, Portlaoise, Co. Laois with access from Well Road Court (Similar to the proposed development in the grant of planning permission for building 'A' in P.A. 08/1430). The development will consist of the demolition of the derelict building on the site, the construction of a three-storey building with five apartments (three X 1-bedroom and two X 2-bedroom), the provision of bike and bin stores, the provision of landscaping including boundary treatments, and all ancillary site development and utility workd
Install a 3m high 'lamp post' style relief vent stack servicing the existing below ground natural gas pressure reduction unit with all ancillary services and associated site works
Retain change of use from dwelling house to office and all associated site works
Provide 12 no. carparking spaces accessed through the existing car park and all associated site works
Retain extension to rear of existing dwelling house, domestic shed to rear and all associated site works
Retain the beer garden and smoking shelter constructed in rear garden, together with covered access from lounge to garden at rear of 106 Main Street, Portlaoise, a protected structure
The brief summarizes the pattern across all 864 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22165The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief