Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 221 decisions within 5 km, 1 exact-site or onsite candidate record, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
A new 110kV substation to feed into the existing Aughinish - Kilpaddoge 110kV overhead line
A ten year permission for the complete development of a Solar PV Energy development with a total site area of 61.29 hectares, to include one Transmission System Operator (TSO) electrical substation with associated switchgear, TSO compound and control building, one customer substation with transformer, communications pole, compound and control building, electrical transformer and inverter station modules, Solar PV panels ground mounted on support structures, access roads and internal access tracks, spare parts storage containers, fencing, electrical cabling and ducting, CCTV and other ancillary infrastructure, a temporary site compound area, additional landscaping and habitat enhancement as required and associated site development works
The construction of a 44.7m underground medium voltage(38kV) grid connection cable from the consented Ballinknockane and Ellaha Solar Farm(PA Ref:17/1220) to the section of Solar Farm currently in planning(PA Ref:22/1258) comprising the laying of underground cables and associated infrastructure
Construction of a two storey dwelling house, waste water treatment system, percolation area, entrance and all ancillary site works
The completion of the existing landfill and storage of timber overground (previous planning ref:s 06/233, 11/7059, 12/164& 17/250. The permission requires a waste licence
To amend condition 6 of planning permission ref 20/688. The amendment will allow for an increase in the maximum tonnage of waste allowed per calendar year from 15,000 to 24,000. On completion of the importation of waste, the site(including the areas previously filled under permissions 06/233, 11/7059, 12/164, 17/250 & 20/688) is to be covered with topsoil throughout and seeded with grass seed. Thes works are to take place at my landfill site and will require a waste permit
The brief summarizes the pattern across all 221 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22313816The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief