Applications tied to the site
Partial coverage12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 349 decisions within 5 km, 12 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
12 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
12 matched1 of 2 layers are loaded for Kerry County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedOne current citation from the Kerry County Council development plan, with section, page and source URL.
1 matched2 of 4 layers are loaded for Kerry County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedCitations are current-dated and carry policy name, section, page and source URL from the Kerry County Council development plan.
1 matchedOpen preview
Open preview
CONSTRUCT A MARINE EDUCATIONAL AND RESEARCH CENTRE ENCOMPASSING AN EXISTING QUARANTINE BUILDING TO THE REAR OF THE MAIN DINGLE OCEANWORLD COMPLEX ALL SERVED BY CAR AND BICYCLE PARKING AND ASSOCIATED EXTERNAL AREAS
RETAIN (A) MAST SUPPORTED TENSILE CANVAS FRONT ENTRANCE CANOPY AND (B) 2 NUMBER EXTERNAL DISPLAY COMPOUNDS, A PENGUIN AND OTTER COMPOUND WITH WATER TANKS SERVED BY KEEPER AND UTILITY SPACES AND AN OPEN AIR PUBLIC VIEWING AREA ALL AS CONSTRUCTED AND ALL WITHIN REIVISED SITE BOUNDARAIES
CONSTRUCT A 2 STOREY EXTENSION TO THE FRONT AND SIDE ELEVATION TO FACILITATE A FIRST FLOOR ELEMENT TO THE DINGLE OCEANWORLD AQUARIUM BUILDING, INCORPORATING ON THE GROUND FLOOR, A NEW ENTRANCE FOYER AND RECEPTION EXTENDED CAFÉ AREA, EXTENDED OFFICE SPACE, AND A PASSANGER LIFT AND STAIR ENCLOSURE TO SERVE THE FIRST FLOOR; AND ON THE FIRST FLOOR, A LECTURE ROOM AND CHILDRENS ACTIVITY PLAY AREA, WITH OTHER ASSOCIATED AREAS, ALSO TO INCLUDE MINOR INTERNAL AND EXTERNAL ELEVATIONAL ALTERATIONS TO THE EXISTING BUILDING, PROPOSED EXTERNAL WALL SIGNAGE AND ASSOCIATED ON SITE ANCILLARY WORKS
(A) THE REMOVAL OF A MAST SUPPORTED TENSILE CANVAS FRONT ENTRANCE CANOPY, (B) TO CONSTRUCT A SINGLE STOREY EXTENSION THE FRONT OF THE DINGLE OCEANWORLD COMPLEX TO ALLOW FOR A NEW PUBLIC ENTRANCE FOYER, (C) NEW SINAGE ERECTED ON THE ABOVE NEW STRUCTURE, AND (D) ALLOW FOR THE REDESIGN OF THE WING WALLS AT THE PEDESTRIAN PUBLIC ENTRANCE TO ALLOW FOR A NEW STEPPED ACCESS ROUTE FROM THE PUBLIC FOOTPATH AND ALL ASSOCIATED EXTERNAL WORKS
A) TO CONSTRUCT DORMER WINDOW TO THE FIRST FLOOR MEZZANINE LOCATED AT THE FRONT OF THE EXISTING DWELLING; B) RETAIN CHANGES TO THE ELEVATIONS OF THE DWELLING HOUSE PERMITTED UNDER PLANNING REF. NO. 94/1302 AND C) RETAIN EXIT DOOR AND LADDER FROM BEDROOM ON THE SIDE EAST SIDE OF THE HOUSE
CONSTRUCT A DOMESTIC STORAGE SHED TO THE REAR OF AN EXISTING DWELLING HOUSE
The brief summarizes the pattern across all 349 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22362The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief