Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
19% of nearby decided applications were refused. The site check found 94 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Roscommon County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Roscommon County Council, so this brief makes no current policy claim and relies on decision history.
3 of 4 layers are loaded for Roscommon County Council and were intersected with the site; flood is not loaded and no conclusion is drawn for it.
3 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Roscommon County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
Permission to: (A) Demolish existing stone built cottage; (B) Construct new single storey domestic dwelling and garden shed and (C) Provide replacement Waste Water Treatment System, PIA Approved, to EPA Code of Practice 2021 and all associated site works at
Permission for development which will consist of 1) proposed restoration of existing two storey detached dwelling and outbuilding along with associated demolitions and external & internal reconfigurations; 2) construction of single storey Kitchen & Living Room extension to the Southeast of the existing dwelling and single storey link between dwelling & outbuilding; 3) construction of First Floor Bathroom extension to North corner of existing dwelling; 4) construction of single storey extension to the Northwest of the existing outbuilding; 5) relocation of existing site entrance; 6) upgrade of existing wastewater treatment system and 7) associated site works & services at
To retain the following - 1) Wastewater treatment plant and sand polishing filter; 2) Extension to rear of building which comprises a lobby and wheelchair WC at
Permission for the proposed construction of extensions on ground & first floor levels to the rear of existing Public House & Restaurant building known as “The Moorings”, for the provision of guest bedrooms together with the proposed upgrading of the existing onsite wastewater treatment system & percolation area to service the above and all ancillary site works at
Permission for proposed construction of extensions on ground & first floor levels to the rear of existing public house & restaurant building known as “The Moorings” for the provision of guest bedrooms and all ancillary site works
Permission for two holiday let accommodation buildings, connection into existing foul water treatment system and all associated site development works at
The brief summarizes the pattern across all 94 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22479The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief