Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 244 decisions within 5 km, 2 exact-site or onsite candidate records, and 4 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matched1 of 2 layers are loaded for Offaly County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Offaly County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Offaly County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
4 structured nearby appeal records.
4 matchedNo current-dated citation is loaded for Offaly County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A PROPOSED NEW SINGLE STOREY DWELLING, NEW VEHICULAR ENTRANCE, DRIVEWAY, WASTE WATER TREATMENT SYSTEM, STORM WATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS
A PROPOSED NEW SINGLE STOREY DWELLING, GARAGE, DRIVEWAY, NEW CONNECTION TO LOCAL AUTHORITIES' PUBLIC WATER MAIN, NEW VEHICULAR ENTRANCE, WASTEWATER TREATMENT SYSTEM WITH PERCOLATION AREA, STORMWATER SOAKAWAYS AND ALL ASSOCIATED SITE WORKS & LANDSCAPING
CONSTRUCTION OF A NEW FOUR BEDROOM DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE, NEW VEHICULAR ENTRANCE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
CONSTRUCTION OF A NEW THREE BEDROOM ONE-STOREY DWELLING HOUSE, NEW EFFLUENT TREATMENT SYSTEM, NEW GARAGE AND ALL ASSOCIATED SITE DEVELOPMENT WORKS
Construction of an extension to the north & west of existing dwelling. The application will also include the renovation of existing derelict dwelling, new biofilter treatment system to replace existing septic tank all associated site works and drainage
• 4 no. playing pitches (Pitch 1 and 2: synthetic all-weather playing pitches with floodlighting, and Pitch 3 and 4: grass playing pitches); • 1 no. grass training/warm-up pitch;• A single level facilities building (approximately 865 sq m gross floor space) with rooftop photovoltaic solar panel array (224 sq m) and associated building signage (4.5 sq m), to incl. entrance lobby, function room with servery and reception area, office/meeting room, weight/training room, multipurpose community room, medical/first aid room with toilet, equipment store, 5 no. spectator toilets (3 no. universal accessible), circulation corridor, universal access toilet, universal access change room with shower and toilet, plant room, storage/kit room, 2 no. referee facilities with shower and toilet, 2 no. change rooms with showers and toilets, and 6 no. change rooms with toilets; • 123 no. vehicle parking spaces arranged in 2 no. car parking areas with site lighting (12 no. EV, 6 no. disabled, 105 no. regular), dedicated vehicle set down area, dedicated coach/bus set down area, and coach/bus parking area; and • Hard and soft landscaping (incl. enhanced boundary treatment planting and ecological buffer biodiversity corridors), access road and vehicle circulation, pedestrian walkways, site lighting, services (incl. tertiary waste water treatment system comprising of proprietary secondary wastewater treatment plant with pumped discharged to raised tertiary treatment modules polishing filter bed, and SuDS based surface water management system comprising permeable paving, grasscrete, a series of stormwater bioretention swales/detention basins located on the site, hydrocarbon interceptor, flow control hydrobrake controlled outflow discharge to drainage ditch within site, and ultimately the Gageborough River), and all other ancillary and associated site development works above and below ground level. Access will be via a new vehicular entrance from the L6045 Local Road with associated road upgrade works to accommodate development related traffic movements at this site of approximately 11 hectares
The brief summarizes the pattern across all 244 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22555The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief