Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
11% of nearby decided applications were refused. The site check found 778 decisions within 5 km, 3 exact-site or onsite candidate records, and 62 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
62 structured nearby appeal records.
62 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To carry out development to an existing light industrial unit. The development will comprise a rear extension to the existing warehouse/logistics/ storage use, removal of existing internal office/staff area to refine existing logistics layout, the provision of a new office/administration/staff extension at the front of the existing building, new boundary screen walls, defined car parking including all associated site development works
The refurbishment and expansion into an existing industrial unit, Unit 11, to comprise of a cleanroom, ancillary office space and associated changes to fenestration and replacement of roof level north lights with solid panels, the change of use of a section of Unit 10 from industrial use to warehouse use, to extend the existing facility by the following:-a north-western link corridor, a south-eastern link corridor, an extension to the Unit 10 warehouse area, an extension to the Unit 10 mezzanine area, upper level Unit 10 office space and plantroom extension, the demolition of an existing compound and the construction of a new external plant compound, changes in fenestration to Unit 10, the construction of an external fire escape stairs, the relocation of existing plant and services, the provision of additional parking spaces and bicycle shelter. Retention is also sought for a canteen link corridor, process plantroom & oil store and workshop/lab building and all ancillary site works and services in relation to the abovementioned works
The subdivision of 54sqm of extant office space in Unit 13 from Warehouse Unit 13A, the provision of one roller shutter goods door to the northwest elevation of Unit 14, the amalgamation of 254sqm of extant office space in Unit 14 into Unit 15, the provision of five roller shutter goods doors to the northwest elevation of Unit 15
The construction extension to existing offices/distribution warehouse and to carry out all ancillary site works required to facilitate the proposed development
A) the change of use of Unit 2(567sqm) and Unit 3(538sqm) from office use to warehouse use b) their subsequent sub-division from Unit 2B and Unit 3A c) the subsequent sub-division of Unit 2 in two separate warehouse units d) the provision of a roller shutter door opening into both the southwest and northeast elevation and a fire escape exit door into the southeast elevation of Unit 2 and the provision of a roller shutter door opening into the southwest elevation of Unit 3 e) the provision of metal cladding to the glazed elevations of Unit 2 and Unit 3
A single storey extension to existing Warehouse Distribution Premises for offices ancillary to the existing warehouse use, new MV Substation and Switchroom, new Doc Leveller, new signage and external fenced services compound. Permission is also being sought for elevational alterations to include for removing existing glazing and roller shutters to the façade and replace with cladding panels to match existing, additional roller shutter doors, removal of existing roof lights and replace with roof cladding panels to match existing and all associated works above and below ground
The brief summarizes the pattern across all 778 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260004The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief