Applications tied to the site
Partial coverage6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 886 decisions within 5 km, 6 exact-site or onsite candidate records, and 50 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
6 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
6 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
50 structured nearby appeal records.
50 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Development comprising; 1. Accessibility and aesthetic improvements to the Out-Patient’s entrance including the provision of a covered ramp, stairs and lift (418m²) and refurbishment of the existing OPD concourse 2. Retention of covid measures to segregate the Emergency Department (red zone) from General Hospital Circulation (green Zone) including temporarily moving the principle public access to The Out Patients Department Entrance on Level 3 on the south façade (The Mall Carpark Side) 3. Provision of 2 no. bus shelters for the shuttle bus service 4. Creation of a new pedestrian access off The Mall giving direct access to the Medial Beds Department under croft (PL18/392 & PL20/375 refer) and temporary main Entrance, with canopy over 5. Provision of a covered walkway to the temporary main entrance 6. Construction of a new internal access road off the main hospital access road, associated retaining walls and site works 7. Alterations to The Mall entrance to improve traffic flow, car park layout, site levels and cycle storage provisions all necessary to enable the above Medical Beds development 8. Minor alterations to parking and road layouts adjacent to the Renal Department to facilitate phasing and delivery of the Medical Beds development (PL18/392 & PL20/375 refer) with minimal disruption or loss of capacity 9. Proposed new signage to assist wayfinding traffic management and orientation. Including all associated landscaping, site works and services. Sligo University Hospital is a Protected Structure. The proposed works are not in immediate contact with the protected structure.
The previously granted permission PL25/60044 comprised a three-storey, 344 m² Nuclear Medicine extension. The proposed amendments to permission PL25/60044 comprise the following: (1) Changes to the layout and elevations through the addition of a 96 m² shell and core storey at Level 6. The total floor area of the Nuclear Medicine extension block, as amended, will be 440 m². (2) Changes to the layout and elevations through the introduction of a shell and core area in lieu of the plant room at Level 5.
Construct a 3 story 344m2 Nuclear Medicine extension block. The development shall comprise the following:(1) Level 3 - 134m2 Nuclear Medicine ward, (2) Level 4 – 114m2 Office Block, (3) Level 5 - 96 m2 Plant Room, (4) alteration to existing staff entrance, (5) all associated site works and services.
PP - for development consisting of the construction of a single storey extension, 27sqm, to the existing CSSD department, replacement of existing windows to powder coated aluminium glazing on the south elevation, provision of a single story temporary CSSD unit for use during construction, 190 sqm, ancillary site works and all associated ground works. the new building is within the curtilage of a protected structure
Development consisting of the construction of a 332.5m2 development at Level 8 & roof level of the multi-storey block over the existing Paediatric Department on level 7. The development shall comprise (1) New 258 m2 extension to the existing Intensive Care Ward at level 8 consisting of 4 new isolation rooms with associated stores, utility rooms, circulation areas and access off existing isolation ward (2) Construction of new 74.5m2 associated plant room at roof level, with all associated connections to existing site services infrastructure. Sligo University Hospital Campus contains a Protected Structure RPS no 217SE. The proposed extensions not in immediate contact with the protected structure.
The development will consist of the construction of a single storey 48.90m² laundry storage facility and to relocate an existing bicycle shelter at Sligo University Hospital
The brief summarizes the pattern across all 886 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 2260012The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief