Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 1,898 decisions within 5 km, 1 exact-site or onsite candidate record, and 167 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
167 structured nearby appeal records.
167 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of permission for planning ref. 16/1: the demolition of 95sqm. of unoccupied floor space and the demolition of entrance structures and canopies; the change of use of unoccupied floor space (7,328sqm.) (in addition to part of the existing car park) from retail and related used to education and training use with related ancillary enterprise and innovation uses and ancillary café use (140sqm.). The development will also consist of the following: additional floor space at ground level (100sqm.) and at first floor level, within the existing building envelope (2,751sqm.) for education and training use with related ancillary enterprise and innovation uses; bike storage areas (58sqm.); storage area (44sqm.); elevational amendments, including new opes and signage; revised internal layouts; alterations to existing roof profile (without increasing the maximum height of the building); provision of roof plant; new service yard to the south; bus shelter; all hard and soft landscaping; revisions to existing car park; external lighting; boundary treatments; changes to levels; and all associated development above and below ground. The gross floor space of the new educational facility (including ancillary café use and external storage areas) will be 10,281sqm.
Development at a c. 0.0178 ha site in the car park of Tesco, Coonagh Cross Shopping Centre, Clondrinagh, Clonconane, Ennis Road, Limerick. The development will consist of: (i) the removal of previously approved and as built 'Click and Collect' canopy and ancillary signage (permitted under Reg. Ref. 20/696); (ii) permission for the construction of a new sheltered canopy (c. 105 sq.m) in the existing car parking spaces and 2 no. dedicated 'Click and Collect' van parking spaces for the existing Tesco store; (iii) permission for 'Click and Collect' signage in the existing Tesco car park and (iv) all associated site works
Development at a c. 0.0099ha site in the car park of Tesco Coonagh Cross, Clondrinagh, Clonconane, Ennis Road, Limerick. The development will consist of the construction of a sheltered canopy(c.55sqm) in the existing car park for the purpose of providing 2 no. dedicated "Click and Collect" spaces for the existing store and ancillary signage and all associated site development works
(a) completion of the existing shell and core building that was previously granted under PI.Reg. 072395, (b) change of use from retail warehousing to a gymnasium with all associated services, (c) construction of a new partial mezzanine floor at first floor level to serve as a part of the gymnasium with all associated services, (d) minor elevational changes to the existing building inclusive of proposed signage, (e) extension of the existing access road and construction of a new car parking area to the front of proposed entrance(s), (f) proposed relocation of Plant Room, (g) connection to all existing services already terminated within the building and all associated site works
A new waste water pump station. This will include the provision of the new underground pumping station and associated emergency overflow storage tank, control kiosks to serve the pumping station, new boundary treatments, landscaping, a proposed access to the new road currently under construction, and all ancillary site works
The construction of a vehicle service area 279.225sqm, to include customer waiting facilities, site fencing & signage, an ancillary space for the adjacent commercial gymnasium 92.225sqm and all associated site works
The brief summarizes the pattern across all 1,898 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 227016The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief