Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
10% of nearby decided applications were refused. The site check found 779 decisions within 5 km, 1 exact-site or onsite candidate record, and 58 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
58 structured nearby appeal records.
58 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Extension of permission for planning ref. 16/900: a 30 acre (12.1ha) solar farm compromising photovoltaic panels on ground mounted frames, 3 no. single storey inverter/transformer stations, 1 no. single storey Sub-Station, security fencing, and all associated ancillary development works
The provision of a new building, ancillary to the existing facility. The proposed new building seeks to add 1988m2 of additional floor space divided up into the following: 992m2 of Research and Development, 806m2 of Manufacturing, 190m2 of Warehousing. Other works include the provision of 100 no. carparking spaces which include accessible spaces and EV charging areas. 6 no. motorbike parking spaces. Secure bicycle parking spaces, refuse/storage yard, building signage, with all ancillary landscaping and associated site works and services
The construction of an extension to link two existing industrial units, provision of a car park and all ancillary site works
The extension of the existing manufacturing facility to include all necessary ancillary works and services
The change of use of a portion of the ground floor of the existing commercial building (119.2m2) to its current use as a retail unit ancillary to the applicant’s food distribution business, together with all associated incidental and ancillary works
The construction extension to existing offices/distribution warehouse and to carry out all ancillary site works required to facilitate the proposed development
The brief summarizes the pattern across all 779 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 227018The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief