Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
12% of nearby decided applications were refused. The site check found 1,305 decisions within 5 km, 3 exact-site or onsite candidate records, and 122 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
122 structured nearby appeal records.
122 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for the demolition of existing Public House, restaurant and function rooms, removal of vehicular entrance and construction of 4 storey/part 5 storey apartment block with 9 no. one bedroom apartments, 13 no. 2 bedroom apartments, bicycle storage, bin storage, play equipment storage, play area, landscaped communal area, two new pedestrian entrances, use of second existing vehicular entrance and carpark with all associated civil and site development works **Significant further information received on 21.7.23 includes revised site plan, floor plans, elevations, reduction on apartment no to 20no, revised landscape plan and revisions to existing car park entrance**
Two-storey extension to the west of the existing house, demolition of the existing garage and single storey replacement garage attached to the existing dwelling, a shed located to the north on the site, alterations to the existing dwelling house and associated site works
Permission for a new front, side and rear single storey extension with roof windows, comprising of 1 bedroom, 1 wheelchair accessible wet room, living area, new roof window to existing roof, a new rear kitchen annex extension to existing house, a new soil retaining wall to rear and side of garden and all associated site works
Part 8 application for permission to carry out the development of 20 No. residential units and all associated/ancillary works on lands off Trinity Street/Mell at Boice Court Phase 2, Drogheda Co Louth the development will comprise of the following; Site 'A' (0.16ha) 3 no. 3-bed, 2-stroey dwellings 1no. 3-bed single-storey dwelling New pedestrian/cycle path linking Phase 1 and Phase 2 of Boice Court All associated Landscaping and ancillary/site development works. Site 'B' (0.24ha) 3no. 3 storey blocks comprising of a total of 16 no. duplex/apartment units, i.e. 2 no. blocks each with 2no. 1-bed apartment and 2 no. 3-bed duplexes and 1 no. block with 4no. 1-bed apartments abd 4 no. 3-bed dupleses Associated bin/bicycle stores New pedestrian route from Boice Court Phase 2 to Cement Road All associated landscaping and ancillary/site development works
Permission for an internal 52m2 extension of the first floor offices at Printing Works
Retention Permission for the change of use from the established commercial garage/filling station (formerly Loughboy Service Station) to a car wash/valeting service and the ancillary site development works.
The brief summarizes the pattern across all 1,305 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22704The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief