Applications tied to the site
Partial coverage9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
7% of nearby decided applications were refused. The site check found 149 decisions within 5 km, 9 exact-site or onsite candidate records, and 9 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
9 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
9 matched1 of 2 layers are loaded for Waterford City and County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Waterford City and County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Waterford City and County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
9 structured nearby appeal records.
9 matchedNo current-dated citation is loaded for Waterford City and County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
For the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application.
For the recycling of construction and demolition materials within the footprint of the existing quarry. The development involves an activity that requires a waste facility permit. An Environmental Impact Assessment Report (EIAR) will be submitted to the planning authority with the application
Extension of Duration to Planning File 17/160 to extend the infill part of the exhausted quarry with inert material and an area to recycle construction materials. The activity involves an activity that requires a waste facility permit
The minor amendments to development permitted under ref. no 23/60610 and comprises the replacement of a detached timber-frame dwelling with a detached block-work dwelling, including ancillary localised site works. The residential development permitted under ref. no. 23/60610 remains otherwise unchanged.
For the construction of a detached timber-frame dwelling, wastewater bio treatment tank and raised soil polishing percolation area, potable well, vehicular entrance and all associated site works
The construction of a part single storey and part two storey Dwelling House, Garage, proprietary wastewater treatment system and percolation area and all associated site works
The brief summarizes the pattern across all 149 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 22739The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief