Applications tied to the site
Partial coverage7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
8% of nearby decided applications were refused. The site check found 2,016 decisions within 5 km, 7 exact-site or onsite candidate records, and 186 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
7 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
7 matched1 of 2 layers are loaded for Limerick County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Limerick County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Limerick County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
186 structured nearby appeal records.
186 matchedNo current-dated citation is loaded for Limerick County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
The development of: segregated cycle lanes and footpath upgrades along the extent of the R510 between Quinn's Cross Roundabout & Raheen Roundabout with dedicated pedestrian and cycle crossing facilities. Upgrade of the traffic signals at Mungret Gate junction to provide both a protected junction arrangement for cyclists & bus priority measures for public transport. 'Front of school' treatment as St. Nessan's National School. Upgrade works to bus stops, side roads junctions, and new road surfacing. Installation of LED public lighting. Surface water drainage works. Landscaping works including tree removal & tree planting. All associated site works
The construction of 155m sq single storey 2 no. mainstream classrooms on the grounds of St. Nessan's National School. The works include removal of existing front boundary wall and gates. The construction of a new entrance, boundary wall, new universal access ramp, associated service diversions and ancillary works
A first floor extension and an overall change of elevation to include erection of porch and bay window and associated development works
The construction of a garden room, garden shed and pergola covering an outdoor cooking area and all ancillary site works
The construction of a single storey extension to the side of existing dwelling house and all ancillary site works
Alterations and extension of existing dwelling house including construction of a first floor side extension and all associated site works
The brief summarizes the pattern across all 2,016 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 228003The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief