Applications tied to the site
Partial coverage3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 438 decisions within 5 km, 3 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
3 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
3 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of the Limerick Greenway Hub @ Newcastle West. The proposed development will include provision of a public plaza, space for temporary bike hire facilities, car parking spaces, universal access parking, electric vehicle charging points, coach and mini bus parking facilities, additional public realm elements including benches, bins, bike stands, bike repair station, and finally the provision of a new signalized pedestrian and cycle crossing point on Station Road which will provide a safe connection from the existing Bishops Court trail to the Greenway Hub
Demolition of existing disused manufacturing building, offices and weigh bridge office and all associated site works
1.construct an extension to rear of existing crèche facility comprising baby sleeping room and playroom, 2. carry out minor alterations and revisions to existing crèche layout to provide new playroom areas and toilet facilities, 3. change of use of portion of existing car park to provide new play area ancillary to crèche facility and revision of existing car parking space layout at rear of crèche, 4. construct new boundary wall to rear of crèche and carry out all associated site works
The construction of a new three storey Primary Care Centre medical facility comprising GP Clinic, Pharmacy, Café, Tusla and HSE medical facilities at ground floor level and HSE Primary Care medical facilities, including diagnostics, at first and second floor levels and all associated ancillary accommodation including Cold Water Storage plantroom, Lift Overrun, louvred screened plant area & PV panels at roof level, and site works comprising, landscaped garden area to Station Road, 120 no. car parking spaces segregated into staff and visitor parking, staff and visitor covered bicycle parking, street lighting, boundary fencing and signage
Erection of a 30m high monopole telecommunications support structure together with antennas, dishes and associated telecommunications equipment all enclosed in security fencing
Amendments to previously permitted development, planning reg. ref. 19/395. The proposed modifications consist of an extra storey at third floor level; the relocation of Domestic & Clinical Waste into a detached single storey building to the rear of the main building; a new access lobby to the front(East) elevation; the change of 6no. of windows to doors at ground floor level; modifications to the position and size of the windows to the four elevations; modifications to the landscaping design including an additional 50no. car parking spaces
The brief summarizes the pattern across all 438 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 228019The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief