Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 439 decisions within 5 km, 1 exact-site or onsite candidate record, and 18 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
18 structured nearby appeal records.
18 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The proposed development will be completed in two phases and will consist of: (a) Phase 1: The provision of 21 no. residential units comprised of two storey and three storey dormer buildings, with a unit mix comprised of 6 no. 1 Bed units, 6 no. 2 Bed units, 6 no. 3 Bed units, 3 no. 4 Bed units: (b) Phase 2: The provision of 10 no. residential units comprised of single storey and two storey buildings, with a unit mix comprised of 4 no. 1 Bed units, 6 no. 2 Bed units; (c) New road running north-west connecting the existing Sycamore Crescent estate with the proposed development, then returning around from the north to run southeast to service proposed units to the rear, including all associated footpaths and 37 no. car parking spaces; (d) Hard landscaping including; bin stores, privacy strip to front gardens, rear garden walls, bicycle stands, installation of street lighting; (e) New public open space including soft landscaping, tree planting, street furniture, street lighting, footpaths; (f) Soft landscaping including planting and trees throughout; (g) Construction of and / or remedial works to boundaries with adjacent sites; (h) Construction of new water main, new foul and storm sewers to connect into existing drainage system, and surface water drainage systems including Suds measures; (i) Connection to public utilities; (j) All associated site works
A change of use from retail unit to gymnasium, office, W.C.
Change of use of an existing ground floor unit from use as a kitchen showroom to use as a day centre for people with disabilities
Alterations & extensions to dwellinghouse, construction of domestic garage and erection of front boundary wall
Change of use of part of the existing dwelling house to commercial use to be utilised for personal training sessions
The construction of six semi-detached dwelling houses and associated site works
The brief summarizes the pattern across all 439 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 228020The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief