Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
5% of nearby decided applications were refused. The site check found 459 decisions within 5 km, 1 exact-site or onsite candidate record, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
The construction of a residential development of one detached, sixteen semi-detached and forty terraced two-storey dwelling houses, thirty six apartments in six three-storey blocks and all associated site works, including access from Station Road
(a) demolition of existing single storey and (b) construction of a two-storey replacement dwelling, with connections to existing utilities and all ancillary site works
Domestic garage to include garden shed and 3no. dog kennels and connections to all existing services
The construction of a second purpose built pre-school/after school facility with associated ancillary spaces, with connection to existing services. Permission is also sought for an all-weather pitch with a ball wall; for provision of the ball stop nets to the all-weather pitch [at 12 metres in height]; with all associated site works
Demolition of front wall of fire damaged cottages and the construction of 2 no. semi-detached houses with separate side gates for rear access with separate connections to all existing services
Removing existing substandard prefabricated building and construct new purpose built pre-school/after school facility with associated ancillary spaces and link connections to existing services with all associated site works
The brief summarizes the pattern across all 459 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 22840The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief