Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
14% of nearby decided applications were refused. The site check found 229 decisions within 5 km, 1 exact-site or onsite candidate record, and 5 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
5 structured nearby appeal records.
5 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
To construct a dwelling house and domestic garage, treatment unit with percolation area and all associated site works. Gross floor space of proposed works: 255 sqm (H) & 60 sqm (G)
For alterations to house design. Gross floor space 190sqm.
Of dwelling house and domestic garage as constructed. Gross floor space of work to be retained Dwelling 229.9sqm, Garage 96.9sqm.
Consisting of the demolition of the existing house and construction of a new 2 storey dwelling with garage and wastewater treatment system plus associated site works. Gross floor space of proposed works, 286sqm. Gross floor space of any demolition works, 146sqm.
For an existing mechanical secondary RBC WWTS system and septic tank along with all ancillary works, planning permission for two proposed tertiary wastewater treatment systems and pump stations along with all ancillary works, within the curtilage of protected structures, being RPS. No. 141, RPS. No. 142 & RPS. No. 143 listed as protected structures
For construction of a new dwelling house, domestic garage and on-site sewage treatment system and retention of on-site mobile home for temporary occupation during the build. Mobile home to be removed upon completion of new dwelling, all ancillary works
The brief summarizes the pattern across all 229 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23154The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief