Applications tied to the site
Partial coverage1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched| PlanIntel brief | PlanningCheck | |
|---|---|---|
| Price | €39 incl. VAT | €49 |
| Nearby decisions | Up to 80 detailed (40 refusals + 40 grants) | Not stated |
| AI planning chat | 5 messages/day free | None |
| Saved-site alerts | Free | None |
Site planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
4% of nearby decided applications were refused. The site check found 198 decisions within 5 km, 1 exact-site or onsite candidate record, and 16 structured appeals.
Evidence maturity
Each section reports its own coverage, per county. “Not yet covered” means the source dataset is not loaded for this local authority, so the brief draws no conclusion there and says where to check — it never reads as “no constraint found”.
1 register record is within the point-match tolerance; a parcel boundary is needed to treat this as exact.
1 matched1 of 2 layers are loaded for Tipperary County Council and were intersected with the site; settlement boundary is not loaded and no conclusion is drawn for it.
1 matchedNo verified rural-housing citation is loaded for Tipperary County Council, so this brief makes no current policy claim and relies on decision history.
2 of 4 layers are loaded for Tipperary County Council and were intersected with the site; flood and built heritage are not loaded and no conclusion is drawn for them.
2 matched0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
16 structured nearby appeal records.
16 matchedNo current-dated citation is loaded for Tipperary County Council. Historic references extracted from decisions are never presented as current policy.
Open preview
Open preview
A 10 year planning permission for development at lands to the north of the N24 National Road in the townlands of Jamestown, Kilmolash Upper, and Rathkeevin County Tipperary. The development will consist of: - Construction and operation of a c. 60MW solar PV farm consisting of solar arrays on ground mounted steel frames, with a maximum overall height of 2.6 metres; - Internal underground electrical cabling and ducting; - Up to 20 no. transformers; 2 no. temporary construction compounds; - Security fencing and cameras; - 2 no. new gated site entrances from the R687 local road; - New internal access tracks; - Site drainage; - Landscaping; - All ancillary works. Planning permission is sought for a period of 10 years with an operational life of 40 years from the date of commissioning. A Natura Impact Statement accompanies the planning application
Construction of a new two storey dwelling, garage, driveway, treatment system, percolation area and new entrance and all necessary site works
Construction of a dwelling house, garage, driveway, treatment system, percolation area and new entrance
The as constructed garage, the 2 no. storage sheds and polytunnel including all associated site works
The renovation of existing dwelling, to construct single storey extensions to the north and west of existing dwelling, install a new wastewater treatment system and percolation area, provide a new splayed entrance and all ancillary site works
Erection of a dairy unit comprising slatted cubicle shed with underground effluent storage tanks, milking equipment, and bulk tank, dairy tank, two no. meal bins, three walled open silage pits and underground soiled water storage tank, meal storage shed, concrete yard, adjustments to existing entrance onto public road to provide required sightlines and all associated site works
The brief summarizes the pattern across all 198 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €39 incl. VAT.
Source match
Matched from public planning record 23172The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief