Applications tied to the site
Partial coverage2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 531 decisions within 5 km, 2 exact-site or onsite candidate records, and 20 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
2 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
2 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
20 structured nearby appeal records.
20 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Permission for a development consisting of the retention of an existing extension to the rear (south) of the existing workshop building and an office section to the side (west) of the existing workshop building, the construction of an extension to the rear (south) of the existing workshop building, the extension of the open yard area, the retention of containers used as welfare and canteen units, the retention of elevational changes to the existing workshop building, the retention of a canopy overhang to the side (west) of the existing workshop building, adjustments to the site layout including the carpark locations and all associated site works, Significant further information relates to, Road Safety Audit, Report from McBreen Environmental, Report from 2HQ Engineers, Ecology Report, Copy of Folios, Forestry Harvest plan, Tree Felling Licence, Fuel interceptor and silt trap data sheet
Permission for the construction of an ESB substation building, a roadway to the unit, the laying of all services and all associated site works
Permission for a development consisting of the demolition of the building known as Ballinode Community Hall and partial demolition of workshop buildings to the south and the east of the community hall building, the construction of a two storey over basement office building with training facilities, the provision of carparking and hard surfaced areas around the building and all associated site works, Significant Further information relates to, Draft Waste Water Management plan, Road Safety Audit, Fuel Interceptor details
Permission for a development consisting of the partial demolition of the building known as Ballinode community hall and the rebuilding of the demolished areas using block work walls with a plastered finish, the replacement of the existing roof structure and finish with the profiled sheeting which is grey in colour, alterations to the internal layout and a change of use to office accommodation from its current use as a community hall, and all ancillary site works.
Permission for development consisting of a revision to house plans and site plans from those previously granted under planning application reference number 21/372, relating to the construction of a single storey dwelling house and all associated site works
Change of house plans from those previously granted under planning application reference numbers 15/134 and 20/9005, relating to the construction of a dormer style dwellinghouse development and all associated site works.
The brief summarizes the pattern across all 531 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23239The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.