Applications tied to the site
Partial coverage5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedSite planning risk brief
One-off house / within 5 km where a location match is available
Executive snapshot
6% of nearby decided applications were refused. The site check found 856 decisions within 5 km, 5 exact-site or onsite candidate records, and 40 structured appeals.
Evidence maturity
Each section reports its own coverage. “Not yet covered” means no conclusion is drawn while source datasets or policy extraction are still being loaded.
5 register records are within the point-match tolerance; a parcel boundary is needed to treat this as exact.
5 matchedCurrent indexed zoning and settlement layers are intersected with the selected site where coverage exists.
Current section-and-page citations have not yet been loaded for this authority.
Each layer reports its own coverage; missing coverage never appears as a clean result.
0 prompts are backed by extracted nearby decision evidence; all prompts remain checks, not predictions.
40 structured nearby appeal records.
40 matchedHistoric extracted references are not presented as current policy; verified citations are still being loaded.
Open preview
Open preview
Demolish existing steel storage shed and their boundary wall along Fr. Brown Avenue and remove two existing portacabins, decommission existing septic tank and connect to mains sewer and construct a 4-dbay commercial building to include toilets, staff lockers, canteen and offices and signage on front façade and all associated and necessary site works
Change of design of existing building to include adding cladding to all elevations, close existing sliding door to rear elevation, add new door opening to front elevation and all associated site works.
Extend existing workshop and all associated site works
Retain change of design and location of workshop and change of location of carwash from that granted under Pl. Ref. 01/378 and all associated site works.
Alter and extend existing loading bay canopy to the rear elevation consisting of an extension of same to the western side of the existing canopy to provide additional covered area (4,750m x 11.6m) for van loading and unloading all at An Post Portlaoise DSU
Build a warehouse industrial storage unit and all associated site works
The brief summarizes the pattern across all 856 matched decisions within 5 km and includes up to 80 detailed comparables (40 nearest refusals and 40 nearest grants), with extracted reasons, quotes, and available source links. €29 incl. VAT.
Source match
Matched from public planning record 23293The site brief adds up to 80 nearest detailed grants and refusals, extracted source evidence, document links, and a shareable risk summary.
Included in site brief
Included in site brief
Included in site brief
Included in site brief